My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
072309
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2009
>
072309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2017 4:46:56 PM
Creation date
6/27/2017 4:31:15 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
7/23/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANG RANCH COMMUNITY PARK 'g <br />DESIGN DEVELOPMENT AND <br />CONSTRUCTION DOCUMENTS Scope of Se* i Cos <br />► R -value (to determine pavement design sections fw *14ny0waYsrand <br />parking lots); and <br />► pH, resistivity, and soluble sulfate and chloride content (to determine <br />(continued) the corrosivity of site soils for foundation design). <br />Portions of samples remaining after the completion of laboratory testing <br />will be stored in the laboratory for 45 days. After 45 days, samples are <br />commonly discarded unless we believe they may have further use or we are <br />notified otherwise. <br />Geotechnical Analyses and Report Preparation <br />Data obtained from the explorations and laboratory testing will be <br />evaluated. Engineering analysis will be performed to develop preliminary <br />geotechnical design recommendations for the proposed project. This <br />report will be signed and stamped by a California Registered Geotechnical <br />Engineer (GE) and California Certified Engineering Geologist (CEG). We <br />anticipate close participation and review with the 2nd Party Consultant <br />during the analysis and report preparation portion of work. It is anticipated <br />that meetings, back -and -forth reviews and several discussions will take <br />place between LGC and the 2nd Party Consultant to come to agreement <br />concerning geometry and interpretation of geologic conditions. We also <br />anticipate numerous discussions and reviews to determine the methods <br />of analysis for determining soil strengths, performing the slope stability <br />review, liquefaction susceptibility, lateral spread considerations and other <br />relevant studies. We anticipate that mitigation options will be developed <br />for discussion with the District and Project Team prior to determination <br />of the final recommendations for site design and construction. We also <br />anticipate preparing documentation recording the various interactions <br />between LGC and- the 2nd Party Consultant. The geotechnical report will <br />be formatted such that it can be assessed by the various reviewing agencies. <br />The report will be useful as a bidding document for grading of the site as <br />it will contain all site recommendations for grading including monitoring <br />'during construction and excavation control, data relevant for construction <br />of foundation elements, wall design information, and general to specific <br />Construction techniques in order to keep the site safe from potential <br />unwanted and dangerous earth movements and other long term negative <br />effects. <br />The geotechnical exploration report will include the following: <br />► Field procedures used in the investigation including reconnaissance <br />mapping and boring location determination and field methodology. <br />► A discussion of earth materials encountered in the explorations and <br />measured engineering properties. <br />P S O M A S <br />Scope of Services I LGC Geotechnical — 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.