Laserfiche WebLink
„, LANG RANCH COMMUNITY PARK <br />aDESIGN DEVELOPMENT AND <br />CONSTRUCTION DOCUMENTS Scope of Sery{EeS <br />P S O M A S sewer to be designed to serve the Erbes Road Park (area H). It is <br />assumed that there exists sufficient cover between the existing <br />finished surface of the driveway and the top of the CMPs to allow <br />(continued) for the utility crossings. Water and dry utilities will be shown in plan <br />view only and will be shown to connection points at public right-of- <br />way. Utility providers are to provide connection points at right-of- <br />way based on plans to be prepared by individual utility providers. <br />site location <br />ADDmoNAL CRPD SERvicE YARD AssuwTioNs —All plans prepared per <br />above Scope will be processed for approval withthe CRPD and <br />the City of Thousand Oaks, if necessary, and will be suitable for <br />construction bidding purposes. Excluded from the above Scope <br />of Services for the CRPD service yard is any CEQA, entitlement <br />processing and approval processing. It is assumed that proposed <br />improvements will be reviewed and approved at staff level only with <br />minimal review by the City of Thousand Oaks. All environmental <br />approval processing, with the exception of the oak tree report <br />described above, is excluded from this proposal. Any upgrades or <br />retrofitting of the existing bridge structure is also excluded from this <br />proposal. Off-site utility plans, if required, will be provided by utility <br />service providers and is not a part of this proposal. <br />PROJECT FUNDING OPPORTUNITIES RESEARCH — Psomas has <br />provided an allowance of forty (40) hours to assist CRPD with research <br />to obtain available State or Federal grant funds that may be applicable to <br />this project. Possible funding sources may be water conservation grants or <br />similar funding sources. <br />CDNsmuc oN SuppoRT SERVICES -- Psomas will provide an allowance <br />of one hundred and sixty (160) hours to provide support of the Psomas <br />construction documents. Included may be responses to requests for <br />information, construction site meetings and distribution of information <br />and documents. This budget is an allowance only and services required <br />beyond this allowance will require additional budget. <br />Project Assumptions <br />District to provide digital Master Site Plan to be used as a basis for all <br />project design. Proposed finished floor grades will also be provided. <br />Fire hydrant and fire department connection requirements and <br />locations are to be determined by the fire department in conjunction <br />with the Architect. On-site water design will be based on these <br />established locations. <br />Specifications will be provided on all construction documents as <br />required for City of Thousand Oaks approval. <br />P S O M A S Scope of Services — 27 <br />Site locatlo11 <br />ADDmoNAL CRPD SERvicE YARD AssuwTioNs —All plans prepared per <br />above Scope will be processed for approval withthe CRPD and <br />the City of Thousand Oaks, if necessary, and will be suitable for <br />construction bidding purposes. Excluded from the above Scope <br />of Services for the CRPD service yard is any CEQA, entitlement <br />processing and approval processing. It is assumed that proposed <br />improvements will be reviewed and approved at staff level only with <br />minimal review by the City of Thousand Oaks. All environmental <br />approval processing, with the exception of the oak tree report <br />described above, is excluded from this proposal. Any upgrades or <br />retrofitting of the existing bridge structure is also excluded from this <br />proposal. Off-site utility plans, if required, will be provided by utility <br />service providers and is not a part of this proposal. <br />PROJECT FUNDING OPPORTUNITIES RESEARCH — Psomas has <br />provided an allowance of forty (40) hours to assist CRPD with research <br />to obtain available State or Federal grant funds that may be applicable to <br />this project. Possible funding sources may be water conservation grants or <br />similar funding sources. <br />CDNsmuc oN SuppoRT SERVICES -- Psomas will provide an allowance <br />of one hundred and sixty (160) hours to provide support of the Psomas <br />construction documents. Included may be responses to requests for <br />information, construction site meetings and distribution of information <br />and documents. This budget is an allowance only and services required <br />beyond this allowance will require additional budget. <br />Project Assumptions <br />District to provide digital Master Site Plan to be used as a basis for all <br />project design. Proposed finished floor grades will also be provided. <br />Fire hydrant and fire department connection requirements and <br />locations are to be determined by the fire department in conjunction <br />with the Architect. On-site water design will be based on these <br />established locations. <br />Specifications will be provided on all construction documents as <br />required for City of Thousand Oaks approval. <br />P S O M A S Scope of Services — 27 <br />