My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
072309
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2009
>
072309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2017 4:46:56 PM
Creation date
6/27/2017 4:31:15 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
7/23/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANG RANCH COMMUNITY PARK <br />DESIGN DEVELOPMENT ANDr <br />CONSTRUCTION DOCUMENTS��� �k3���� <br />P S O M Q S Quality Certification to the RWQCB. The application will include a <br />project description, an impact analysis, a discussion of avoidance and <br />minimization of impacts using best management practices (BMPS), <br />(continued) jurisdictional delineation information, a discussion of potential impacts <br />to water quality, all associated figures (vicinity maps, project site map, <br />construction/grading cross-sections, etc.) and copies of the wetlands <br />applications submitted to the CDFG and ACOE. Psomas will coordinate <br />with the RWQCB staff following the submission of the application. This <br />task will include one meeting with RWQCB staff. <br />RESToRAnoN Jw E*ENTAnoN, MON=R1NG AND REPomwrx -Psomas will <br />prepare a 10 -year monitoring and maintenance plan, and long-term <br />management plan for Braunton's milk -vetch. <br />Plantings: Once the restoration plan is accepted and approved by <br />the Resource Agencies and the USFWS, Psomas will assist with the <br />implementation of the restoration/enhancement plan. Psomas assumes that <br />Lang Ranch Community Park or the landscape architect will coordinate <br />with a qualified Nursery to initiate the plantings and install irrigation. <br />Psomas will conduct one site visit with the restoration company to identify <br />the mitigation site location and to discuss restoration methods prior to <br />planting activities. Photos will be taken from the pre -determined, or fixed, <br />photograph stations to document the plantings. <br />Monitoring: To ensure the progress of the mitigation -planting program, <br />Psomas will monitor the mitigation site for a period of up to ten years <br />following the installation of the plantings described above. Psomas has <br />estimated the number of site visits required to document the progress of <br />the mitigation site based on experience with similar projects. However, <br />this schedule can be adjusted as needed depending on the status of the <br />plantings, and is provided in Table 1: Proposed Monitoring Schedule. <br />w lei ap r "iloo. g 1 <br />NWirnboul <br />yeai <br />I <br />4 <br />4 <br />2 <br />4 <br />3 <br />2 <br />4 <br />2 <br />5 through 10 <br />Total Number of 5iteVisite: 26 <br />10 years <br />P 5 A M A 5 Scope of Services - 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.