Laserfiche WebLink
LANG RANCH COMMUNITY PARK <br />•~ DESIGN DEVELOPMENT AND <br />,. CONSTRUCTION DOCUMENTS <br />PS V MAS <br />(continued) <br />� w <br />t:. <br />sLe 'ocafti <br />site location <br />Scope of Services <br />The introduction will summarize the background material relevant to the <br />project and summarize the findings and conclusions for an easy and quick <br />review. The project location section will describe the project's location <br />in regional, local, and topographic contexts. A figure will be provided <br />to accompany each locality description. The purpose and need section <br />will explain why the delineation was performed and its relationship to <br />the permit and the project. The methods will explain clearly how the <br />delineation was performed and the equipment used to GPS the limits of <br />jurisdiction. The methods will also include the personnel, dates the field <br />work was performed, and a detailed figure(s) graphically depicting the <br />delineation area. The results will state the area delineated and the show and <br />explain the limits of federal and state jurisdiction. Psomas will prepare two <br />draft copies for review and comment, and will subsequently prepare a final <br />for submittal to the USACOE and CDFG. Psomas will respond to one set <br />of comments from the USACOE and prepare a final. <br />JURISDICTIONAL PERMITTING <br />Section 404 Pre -Construction Notffccation <br />Psomas will complete and submit a Section 404 Pre -Construction <br />Notification (PCN), requesting use of a Nationwide Permit to the ACOE. <br />The application will include a project description, a wetland delineation <br />report, all associated figures (vicinity maps, project site map, construction/ <br />grading cross-sections, etc.) and copies of the wetland permit applications <br />submitted to the RWQCB and CDFG. Following submittal of the <br />application, Psomas will coordinate with the ACOE in order to address any <br />concerns. This task is anticipated to include one meeting with the ACOE <br />at the field site. Psomas assumes that an appropriate project description, <br />grading plans, and appropriate diagrams. and figures will be provided. <br />Section 1602 Streambed Alteration Agreement <br />Psomas will submit to the CDFG an application for a Section 1602 <br />Streambed Alteration Agreement (FG2023 Form). The application will <br />include a project description, an impact analysis, a discussion of avoidance <br />and minimization of impacts, a wetland delineation report, all associated <br />figures (vicinity maps, project site map, construction/grading cross- <br />sections, etc.) and copies of the wetlands applications submitted to the <br />RWQCB and ALOE. Psomas will coordinate with the CDFG staff; this <br />task is anticipated to include one meeting with CDFG at the project site. <br />Psomas assumes that an appropriate project description, grading plans, and <br />appropriate diagrams and figures will be provided. <br />Section 401 Water Quality Certification Application <br />Psomas will complete and submit an application for a Section 401 Water <br />PSOMAS Scope of Services — 15 <br />