My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
072309
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2009
>
072309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2017 4:46:56 PM
Creation date
6/27/2017 4:31:15 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
7/23/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANG RANCH -COMMUNITY- PARK a'` <br />DESIGN DEVELOPMENT AND Project Underim" <br />CONSfRUclioN DOCUMENTS <br />.x ,,,,�s ;o,, - tools and management practices to drive the timely completion and <br />coordination of these plans with all of the involved consultants. Internal <br />and external quality control and quality assurance reviews will be made <br />(continued) of all plans and specifications produced by the team. Peer reviews are also <br />undertaken to allow additional "fresh" eyes to review the plans before <br />they are considered complete. Improvements suggested by these peer <br />reviews are generally incorporated and provide a higher level of value to <br />the completed documents. Submittal to the local governmental agencies <br />will be easy as we will contact them during the design to alert them of the <br />upcoming review requests and to.gatherhelpful tips on 4asing the review <br />process. By including them early in the process, it eliminates some of the <br />difficulties of getting the plans received and assigned to the review process. <br />The consultants will resolve the plan check comments of the agency <br />officials and then incorporate these into the 100% construction documents. <br />The issuance of the District's approved plans and construction permits will <br />facilitate the creation of the final Engineers Estimate of Probable Cost and <br />allow for bidding for the construction of the project. <br />Phase 11 of the scope of work includes bidding and the recommendation for <br />award of the construction contract. During the bidding process, the design <br />team will assist the District in fielding any questions that the bidders may <br />present and then offer their evaluation of the submitted responses to the <br />Request for Bid. Upon acceptance of the bid and issuance of the Notice <br />to Proceed to the selected general contractor, the design team will be <br />responsible for providing plans and specifications as well as preparing for <br />the actual construction. <br />Construction Monitoring <br />The degign team will coordhiate- the pre-coristructiori conference and <br />provide minutes for distribution to all attendees. During the construction <br />of the project, the design team will diligently process submittals and <br />Requests for Information, and assist the District with field observations of <br />the ongoing construction. The design team will attend critical construction <br />meetings as required and provide the necessary documentation these <br />meetings will generate. The design team will also provide assistance with <br />contractor Request for Change proposals and monthly billing requests. <br />During a typical athletic field renovation project, the design team identifies <br />the critical phases that will require on-site observation and approval by <br />an experienced sports engineer. The design team will be on-site for these <br />observations and will monitor all the critical construction installations and <br />tolerances to ensure a premium installation and the construction of a fully <br />functioning synthetic turf field. <br />PSOMAS Project Understanding and Approach 1 CMX — 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.