My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
072309
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2009
>
072309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2017 4:46:56 PM
Creation date
6/27/2017 4:31:15 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
7/23/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
® <br />Project Understanding and A- proac ip <br />L. Newman <br />,;. <br />L. Newman Design Group, Inc. was the original Lang Ranch Master <br />Design. Group, Inc. <br />Landscape Architect, which makes us immediate) aware of the difficult <br />y <br />soil characteristics, such as agronomical and soil infiltration gates. L. <br />Newman Design Group, Inc. has reviewed the goals and requirements <br />listed in the RFQ, RFP and EIR as provided. As requested, LNDG, Inc. has <br />31300 Via Colinas <br />included a scope and fee schedule relevant to the RFP. <br />Suite 104 <br />Westlake Village, <br />L. Newman Design Group, Inc. will assist Psomas to produce a design <br />California 91362 <br />development package suitable for presentation and a construction document <br />set suitable for construction bidding. We.wili coordinate the phases of our <br />work with the Psomas team, the Park District, the Community, the City of <br />Thousand Oaks and other required agencies. We will research appropriate <br />plant palettes for the specific project soil types and microclimate zone. <br />We will endeavor io apply creative and quality design for the hardscape, <br />signage, landscape, irrigation, tot lots, bridges, gazebos or open trellises, <br />trails, safety and preservation of the natural features of the site. We <br />will provide water calculations to demonstrate water use and results of <br />water conservation design techniques and methods. With today's water <br />conservation concerns we will recommend a central irrigation system to <br />efficiently water the site and conserve natural resources. Consideration. of <br />wastewater treatment and storm water reuse will be reviewed by the Design <br />Team and the water reuse will be incorporated into the irrigation design. ' <br />P 5 O M A S <br />L. Newman Design Group, Inc. will provide a detailed and accurate. <br />cost analysis for all of the project components related to their scope of <br />work. Researching and implementing new technologies to emphasize <br />and maintain a state-of-the-art, quality design and product is a critical <br />component of our approach to this project. <br />Project Understanding and Approach I Lee Newman Design Group _ 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.