Laserfiche WebLink
B <br />LANG RANCH COMMUNrry BARK <br />DESIGN DEVELOPMENT AND <br />. CONSTRUCTION DOCUMENTS <br />PSOMAS <br />PSOMAS <br />Project Design Schedule <br />PRE -DESIGN PHASE <br />► Program verification <br />► Project kick-off meeting <br />DESIGN DEVELOPMENT PHASE <br />Environmental <br />► Site investigation and jurisdictional delineation <br />► Determine restoration/enhancement site' <br />► Habitat mitigation and monitoring plan — coastal sage scrub and <br />Braunton's Milk -Vetch <br />► 404 Army Corp permitting <br />► 1602 Fish and Game permitting <br />► 401 water quality permitting <br />► Ventura County Watershed Protection District permitting <br />► Oak Tree Report <br />Geotechnical <br />► Background review <br />► Geotechnical field investigation <br />► Laboratory Testing <br />► Geotechnical analysis and report preparation <br />Civil <br />► Aerial'topogiaphy preparation <br />► As -built field survey and boundary calculation <br />► Preliminary rough grading plan <br />1 Preliminary fine grading and drainage plan <br />► Preliminary utility plan <br />Landscape Architect <br />► Design Development Site plan <br />Sports Fields and Courts <br />1 Preliminary athletic field layout plans <br />► Preliminary athletic field surfacing plans <br />► Preliminary athletic field finish grading plan <br />Project Schedule — 79 <br />