Laserfiche WebLink
CH:1 fJ.�QAe.EN ITY PAm <br />NI•QP J <br />: <br />�ONSfRUCTlON�i"IEPems: <br />DOCU <br />NTS 4 � r <br />P S Q H .A S ► Preliminary athletic field. storm drain plans <br />► Preliminary athletic field utility plans <br />► Preliminary athletic field irrigation plans <br />(continued) ► Preliminary athletic field lighting plans <br />► Preliminary electrical/communication layout plans <br />Architectural <br />Preliminary architectural plans <br />Electrical Engineer <br />Preliminary electrical plans <br />Design Development Cost Estimate <br />Design development project presentations <br />Conejo Parks and Recreation District <br />► Thousand Oaks Planning Commission <br />► Thousand Oaks City Council <br />► Citizen's Design Review Panel <br />CONSTRUCITON DOCUMENT PHASE <br />Pre -design meetings <br />Civil <br />► Hydrology study <br />>. Rough grading. plan <br />> Fine grading and drainage plan <br />► Horizontal control plan <br />► Utility plan <br />► Street improvement plans . <br />► Signage and striping plans <br />Off-site sewer plans <br />/ Erosion control plan — rough grade <br />► Erosion control plan fine grade <br />► Storm water pollution prevention plans <br />► Storm water quality urban impact mitigation plan <br />P S O M A S Project Schedule — 80 <br />