My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
072309
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2009
>
072309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2017 4:46:56 PM
Creation date
6/27/2017 4:31:15 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
7/23/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;X. <br />af. r,,�tr . ga r�,, ,�- 'c .d r ' _ .'� is 'a. � n st. . •+ k � K �, xn•' <br />I N QE 4 3P�EW�ANR-:, t ^' <br />CONSTRUCTION DOCUMENTS r <br />i <br />1 e, �, �i. <br />by, <br />Total Estimated Budget <br />Relmbursables <br />$ 67,735 <br />$ 1,506 <br />NOTEWusco Lighting works closely with Reedoorp Engineering, therefore Musco w2! not have a separate <br />scope of services or fees for the design of the project <br />OAKBROOK SERVICE YARD $ 7,1300 <br />Plans 1 LS S 7.000 <br />Construction Support . LS S 800 <br />Reimbursables 1 LS S 200 $ 200 <br />P S O M A S Compensation I Reedcorp/Musco — 78 <br />Reedcorp <br />Electrical <br />{ <br />Hours <br />Rate <br />r <br />Subtotal <br />Total <br />plans <br />S 45,005 <br />Principal <br />115 <br />140 S <br />16,100 <br />Project Manager <br />-125 <br />95 S <br />11,875 <br />Designer <br />81 <br />60 S <br />6,480 <br />Drafting <br />115 <br />70 S <br />8,050 <br />Clerical <br />54 <br />50 S <br />2,500 <br />Title 24 for Exterior Lightina <br />S 4,010 <br />Principal <br />5 <br />140 S <br />700 <br />Project Manager <br />26 <br />95 S <br />2,470 <br />Designer <br />0 <br />80 S <br />- <br />Drafting <br />12 <br />70 S <br />840 <br />Clerical <br />0 <br />50 S <br />Surveillance and Intrusion Alarm system <br />S 3,500 <br />Principal <br />16 <br />140 S <br />2,240 <br />Project Manager <br />0 <br />95 S <br />- <br />Designer <br />0 <br />80 S <br />- <br />Drafting <br />18 <br />70 S <br />1,260 <br />Clerical <br />0 <br />50 S <br />Restroom Buildings built on4te Electrical <br />S 6,730 <br />Principal <br />12 <br />140 S <br />1,680 <br />Project Manager <br />20 <br />95 S <br />1,900 <br />Designer <br />0 <br />s0 S <br />- <br />Drafting <br />45 <br />70 S <br />3,150 <br />Clerical <br />0 <br />50 S <br />- <br />E Scope of Work - Title 24 for Building L!ghtina <br />S 2,560 <br />Principal <br />7 <br />140 S <br />980 <br />Project Manager <br />16 <br />95 S <br />1,520 <br />Designer <br />0 <br />80 S <br />Drafting <br />0 <br />70 S <br />Clerical <br />0 <br />50 S <br />Construction Support <br />S 5,990 <br />Principal <br />$ <br />140 S <br />1,120 <br />Project Manager <br />38 <br />95 S <br />3,610 <br />Designer <br />0 <br />a0' S <br />Drafting <br />18 <br />70 S <br />1,260 <br />Clerical <br />0 <br />50 S <br />Total Estimated Budget <br />Relmbursables <br />$ 67,735 <br />$ 1,506 <br />NOTEWusco Lighting works closely with Reedoorp Engineering, therefore Musco w2! not have a separate <br />scope of services or fees for the design of the project <br />OAKBROOK SERVICE YARD $ 7,1300 <br />Plans 1 LS S 7.000 <br />Construction Support . LS S 800 <br />Reimbursables 1 LS S 200 $ 200 <br />P S O M A S Compensation I Reedcorp/Musco — 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.