Laserfiche WebLink
scouts troops working on community service projects and Boy Scouts doing Eagle Scouts <br />projects; <br />A literacy/story hour `Books in the Barn" program for 15 pre-school children of all <br />abilities <br />• I lb Anniversary Diamond Horseshoe Club Reception for major supporters at the <br />Conservatory of Mr. David H. Murdock; <br />• Continuation of drill team for riders with disabilities ; <br />• Two week-long summer day camps for disabled riders as well as able bodied riders ; <br />Disability Awareness Day at Redwood Middle School; <br />VIP in-house horse show in April; <br />• CALNET State Championship horse show at LA Equestrian Center in May (Ride On <br />manages the entire competition and took 14 riders from TO alone); <br />• Hippotherapy program expanded from 3 to 13 patients using a combination of Ride On <br />equestrian staff with Physical Therapists from the Simi Valley Hospital Child <br />Development Center; <br />- Participation in the Conejo Valley Days Parade. <br />Walnut Grove Equestrian Center —Site Improvements, M&O <br />Improvements to the Walnut Grove Equestrian center continue as funding is generated. In the year <br />ending July 2005 activities include: <br />• Phase II of improvements to the storage barn continued adding 432 square feet of <br />therapy/meeting and office space. This was funded by a combination of Ride On/CRPD <br />and City of TO allocations. <br />• Landscaping improvements consisted primarily of volunteer projects to maintain and <br />improve the appearance of WGE with incidental expenses funded by Ride On <br />• Operating costs of approximately $4,915 annually were incurred by Ride On to pump the <br />bathroom tank. <br />• Electricity and rubbish is paid by Ride On through the CRPD amounting to $5,291. <br />• Ride On is responsible for propane. <br />Last year, the CRPD coordinated the construction of an ADA -accessible wheelchair ramp from the <br />barn level to the arena level. This project was a wonderful and much needed improvement. Thank <br />you! <br />Future Ero'ects <br />The sewer project remains a cost-effective and needed project. The current $5,00U annual <br />pumping cost would pay for the entire sewer hook-up in six years and remove a serious constraint <br />on growth. We have requested CRPD staff consider building a trail which would serve as a bench <br />for the sewer trench and which would both lower the cost of sewer construction and serve our <br />