My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
052809
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Minutes
>
2009
>
052809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 6:49:53 PM
Creation date
8/4/2016 6:49:34 PM
Metadata
Fields
Template:
Board
Document Type
Minutes
Date
5/28/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 28, 2009 <br />Page 4 <br />It was moved by Gibson, seconded by Lange, and carried 5-0 to approve <br />the Master Plan revisions. <br />B. Personnel Actions to Reorganize Fleet Division <br />Hare referenced the documentation and summarized the recommendations. He <br />said that, due to the retirement of the Lead Equipment Mechanic, anticipated to <br />be in August 2009, staff recommends a reorganization of the fleet services <br />section of the Parks and Planning Division. The duties of the Lead Equipment <br />Mechanic will be split between the Senior Grounds Supervisor and the Fleet <br />Technician II. It is expected there will be an initial overall savings of <br />approximately $39,000 per year in salaries and benefits, and changes will be <br />effective upon the retirement of the Lead Equipment Mechanic. <br />It was moved by Lange, seconded by Gibson, and carried 5-0 to. <br />1. Eliminate the existing Lead Equipment Mechanic position (range 51); <br />2. Reclassify the existing Equipment Mechanic position (range 47) to Fleet <br />Technician 11 (range 49); <br />3. Add a Fleet Technician Assistant position (range 35); <br />4. Approve job specification of Lead Fleet Technician Assistant position <br />(range 39). <br />9. ITEMS FOR DISCUSSION <br />None <br />10. REPORTS AND ANNOUNCEMENTS <br />A. Multi -Agency Funding Options Review Contract Award by City of Thousand <br />Oaks <br />Friedl reviewed that in 2008, the board authorized staff to work with Conejo <br />Valley Unified School District and the City of Thousand Oaks to develop a "Multi - <br />Agency Funding Options Survey" and authorized an expenditure not to exceed <br />$20,000. At the May 19 City Council meeting, Phase 1 of a contract with True <br />North Research Incorporated together with Tramutola, LLC was approved in an <br />amount not to exceed $53,124 for all three agencies. The expected timeframe <br />for the telephone survey is fall of 2009. <br />
The URL can be used to link to this page
Your browser does not support the video tag.