My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
061820
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Minutes
>
2020
>
061820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 10:44:21 AM
Creation date
7/7/2020 10:43:55 AM
Metadata
Fields
Template:
Board
Document Type
Minutes
Date
6/18/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 18, 2020 <br />Page 3 <br />worked with Encompass Consultant Group on a variety of projects; they are a local group and are <br />trustworthy and thorough. Hare noted Encompass Consultant Group was very helpful in <br />preparing preliminary information for a CRPD FEMA grant application. <br />Regarding Recommendation #3, in March of this year the Board authorized bidding out for <br />requests for proposals (RFPs) for this project. An RFP was advertised; 12 proposals were <br />received, and they were reviewed by staff from both the Parks and Recreation divisions. Andrew <br />Goodwin Designs came out on top. They were interviewed and determined to be a solid company <br />with a good history, relevant experience, and a shared vision for the project. Hare referenced the <br />conceptual site plan renderings which are currently very basic. The contract was tailored in <br />Phases; Phase 1 and Phase 2 will include programming and schematic design; future phases <br />include design development, construction documents, etc. The anticipated cost for all the phases <br />is approximately $750,000. <br />It was moved by Huffer, seconded by Cusworth, and carried 5-0 to: <br />1. Allocate funds from SCE Settlement Funds (Account 10-00-1890.00 <br />Miscellaneous Revenue) to various accounts as detailed in Attachment A. <br />2. Authorize General Manager to enter into a contract with Encompass <br />Consultant Group in the total amount of $175,700 for surveying, <br />environmental, and engineering services for Districtwide drainage <br />improvements <br />3. Authorize General Manger to enter into a contract with Andrew Goodwin <br />Designs in the total amount of $137,584 for Phases I and 2 of environmental, <br />landscape architectural, and architectural services for Conejo Community <br />Park and Center Improvements <br />B. Proposed Adjustments to the Fiscal Year (FY) 2020-21 Preliminary Operating <br />Budgets, the Second Year of the 2 -Year Budgets <br />Smith made a presentation on the key changes to the budget, including expenditure <br />changes occasioned by Covid-19. She explained how the unemployment situation is <br />affecting CRPD. The budget reflects Recreation expenditure reductions, including <br />reductions by work center, and revenue assumptions, including General Fund Revenue. <br />These changes will result in a $658,136 Budget Gap. Staff suggested two options to fill <br />this gap — taking the funds from the Unassigned Fund Balance or from the Operating <br />Reserve; staff recommends using the Unassigned Fund Balance; Board members <br />concurred. <br />C. Mountains Recreation and Conservation Authority (MRCA) Preliminary Budget <br />Smith reported the MRCA budget reflects impacts due to COVID-19 with decreases in <br />revenue and expenses. The MRCA Board has already approved this preliminary budget. <br />It was moved by Huffer, seconded by Nickles, and carried 5-0 to approve the MRCA <br />Preliminary Budget for Fiscal Year 2020-21. <br />
The URL can be used to link to this page
Your browser does not support the video tag.