Laserfiche WebLink
P S O M AS provide all the thematic elements expected.for.a community park in: the <br />Lang Ranch neighborhood while maintaining the spirit of the approved <br />master plan. CMX will concurrently prepare. agendas of possible <br />(continued) components and programs of the sports fields and courts to be used in <br />discussions with the District. Based on results of the biology survey, <br />geotechnical investigation and input from the District, the Project Team <br />will then prepare descriptive and colorful exhibits that will be used in <br />presentations to the District, the Thousand Oaks Planning Commission, <br />the Thousand Oaks City Council and the Citizen's Design Review <br />Panel. Based on.input and recommendations received as a result of these <br />presentations; the Project Team will work with the District on refining and <br />completing the design development plans. <br />P S O M A S <br />Construction -documents will then be prepared by all members of the <br />Project Team. Psomas will complete the rough grading plan based on <br />recommendations provided by LGC and will assist in obtaining a grading <br />permit so that construction may begin. Psomas -will, have obtained all <br />jurisdictional permits necessary for grading to begin including required <br />permits from the City, County, State and Federal agencies. <br />Included in the construction documents will be a complete set of <br />improvement plans from the civil engineer, the Iaindscape architect, the <br />sports field and courts consultant and the architect. All members of the <br />team will work cohesively with the District so that all project components <br />are accurately represented on each team member's plans. <br />In addition to the rough grading plan, Psomas will prepare a fine grading <br />and drainage design plan and horizontal control plan that will allow <br />for survey and construction of all improvements. The fine grading and <br />drainage plan.will provide all drainage devices and specifications to <br />accommodate the site drainage. This system will comply with the Ventura <br />County Watershed Protection District requirement of detaining stormwater <br />runoff on-site so that the pre -development flows are not exceeded by <br />post -development stormwater flows. Innovative detention solutions will - <br />be implemented so that a minimal area of usable pad will be required <br />for detention facilities. One possible solution to be investigated is the <br />use of over -sized pipes for the subsurface drainage of the baseball fields <br />that may also provide storm water storage capacity to meet the detention <br />requirement. Psomas will also prepare a SQUIMP that will provide <br />all recommendations necessary to achieve adequate runoff quality as <br />required by the State Water Resources Control Board. Off-site street <br />improvements will also be provided including a traffic signal at the <br />intersection of Westlake Boulevard and Rainfield Avenue. Psomas will <br />assist the District in determining if relocation of the gates serving the <br />Project Understanding and Approach — 3 <br />