Board of Directors - 2, September 1, 2005 <br />On September 9, 2004, after an administrative hearing, the lighting application was denied with <br />the recommendation that the District provide additional traffic and lighting studies in response <br />to concerns raised during the administrative hearing. <br />In response, District staff and consultants have prepared the attached Mitigated Negative <br />Declaration (MND) for the proposed dog park lighting project. On July 25, 2005, the 20 -day <br />review and comment period began for the Draft MND. The notice of public review was also <br />published on this date in the Ventura County Star and all residences within 500 feet of the <br />subject property were notified via postcards by mail. The notice as well as the Draft MND was <br />also sent to the City of Thousand Oaks. Three comment letters were submitted in response to the <br />public notice. Staff and Consultant responses to these comments are included with the proposed <br />Final MND attached. <br />Project Description: <br />The existing dog park of 3.45 acres with perimeter fencing and turf inside the fence boundary <br />and adjacent parking lot comprise the complete lighting project area. The project would add <br />seventeen (17) square steel light poles 30 feet in height mounted on concrete footings. [A typical <br />street light pole in Thousand Oaks is 32 feet on arterials, 31 feet on residential collector street <br />and 25 feet on residential streets.] Each pole is arm -mounted with a "shoebox" style fixture with <br />cut-off distribution. One 400 -watt metal halide lamp per fixture. The lighting system has both <br />automatic and manual "push-button" controls which would only be activated as needed and <br />would automatically turn-off at 8:30 PM. The system is designed for illumination levels of an <br />average of 1 to 2 footcandles on the ground — the City's standard for parking lots. <br />The purpose of the project is to allow park patrons with dogs to be able to use the park after <br />typical work hours until 8:30 PM regardless of the season. <br />The environmental review of the project under CEQA identified potentially significant effects <br />related to aesthetics (addition of lighting), but found that with the implementation of mitigation <br />measures, impacts would be less than significant. Potential impacts related to energy resources, <br />noise, traffic and all other areas were determined to be less than significant impacts. <br />Prior to project approval, the Board of Directors, as Lead Agency for the Project, is required to <br />adopt the final MND, make certain findings as required by law including Findings of Fact, and <br />adopt a Mitigation Monitoring and Reporting Program (all of which are included in the packet). <br />RECOMMENDATION <br />Staff recommends that the Board of Directors adopt the attached Resolution No. 090105-A that: <br />1. Adopts that the final MIV'D has been completed in compliance with CEQA; <br />2. Finds that the Board of Directors has reviewed and considered the information in the final <br />MND before approving the project; <br />3. Finds that the final MND reflects the District's independent judgment and analysis; <br />