My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
REVISED AND REPLACEMENT ITEM 9A TRIUNFO COMMUNITY PARK BID
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2016
>
120116
>
REVISED AND REPLACEMENT ITEM 9A TRIUNFO COMMUNITY PARK BID
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2016 1:54:07 PM
Creation date
11/28/2016 1:53:08 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
12/1/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL MANAGER <br />Jim Friedl <br />DATE: <br />TO: <br />FROM: <br />SUBJECT: <br />Conejo Recreation & Park District <br />December 1, 2016 <br />BOARD OF DIRECTORS <br />Chuck Huffer, Chair <br />George M. Lange, Vice Chair <br />Susan L. Holt, Director <br />Joe Gibson, Director <br />Ed Jones, Director <br />GENERAL MANAGER EMERITUS <br />Board of Directors Tex ward <br />Jim Friedl, General ManageEAGENDA <br />REVISED AND REPLACE ITEM <br />(This Board Report Supercedes Prior Board Report Recommending Award to <br />STL Landscape, Inc.) <br />Award Bid for Triunfo Community Park Reclaimed Irrigation Water Project; <br />Authorize Purchase of Booster Pump and Installation Services From Vaughn <br />Irrigation Services, Inc. <br />RECOMMENDATION <br />1. Determine that the Triunfo Community Park Reclaimed Irrigation Water Project is categorically <br />exempt from the California Environmental Quality Act (CEQA). <br />2. Approve construction of reclaimed irrigation water system at Triunfo Community Park. <br />3. Transfer $175,000 from Turf Conversion Accounts to this project. <br />4. Transfer $95,000 from Unassigned Funds to this project. <br />5. Award bid to FS Contractors, Inc. for $558,487 plus contingency in the amount of $41,754, <br />totaling $600,241 for irrigation equipment modification from potable to reclaimed water, <br />including new reclaimed water mainline and pump installation coordination, backflow removal, <br />existing valves, heads, mainline, and potable water line modification, installation of new <br />potable water line, turf renovation, decomposed granite paving, concrete walkways, tree and <br />shrub planting and mulch groundcover installation. <br />6. Authorize purchase of booster pump and installation services from Vaughn Irrigation Services, <br />Inc. in the amount of $113,612. <br />CEQA COMPLIANCE <br />For the Board consideration and approval, District staff believes the project qualifies for a Class <br />2 Categorical Exemption, pursuant to Section 15302 of the CEQA Guidelines. Class 2 exemptions <br />include replacement or reconstruction of existing structures and facilities where the new structure <br />will be located on the same site as the structure replaced and will have substantially the same <br />ADMINISTRATIVE OFFICES <br />403 West Hillcrest Drive • Thousand Oaks, CA 91360-4223 <br />(805) 495-6471 • FAX: (805) 497-3199 - Email: parks@crpd.org • Website: www.crpd.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.