My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
BORCHARD REPORT
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2014
>
040314
>
BORCHARD REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2016 2:06:00 PM
Creation date
9/20/2016 2:05:19 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
4/3/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The low bid received from J Evans Construction was withdrawn (see attached) at the request <br />of the contractor. <br />The second low bid received from Unlimited Engineering Contracting Inc. meets all the <br />required specifications. Recommendation for award is based on the base bid. Unlimited <br />Engineering Contracting Inc. is qualified as a General Engineering Contractor, with an A <br />license, and has performed projects of similar size and scope. <br />Project Financial Status: <br />FY 13/14 BUDGET <br />BUDGET <br />CIP Budgeted Funds <br />$ <br />300,000 <br />Additional Appropriation <br />$ <br />50,000 <br />TOTAL BUDGET <br />$ <br />350,000 <br />FY 13/14 COSTS <br />PAID TO DATE (as of 3/25/2014) <br />Survey <br />$ <br />1,540 <br />PROJECTED COSTS <br />Construction <br />Unlimited Engineering Contracting Inc. <br />$ <br />326,500 <br />Construction Contingency (7%) <br />$ <br />21,960 <br />TOTAL COSTS <br />$ <br />350,000 <br />FY 13/14 PROJECTED BALANCE <br />$ <br />0 <br />STRATEGIC PLAN COMPLIANCE <br />Meets 2013 Strategic Plan Element 2.3: Maintain the 10 -Year Capital Improvement Plan. <br />Regularly update the 10 -Year Capital Improvement Plan to prioritize projects and effectively <br />plan and allocate future resources. As capital funding allows, execute, implement and develop <br />project each year in accordance with the plan. Update plan every two years as part of the <br />budget process. <br />Respectfully submitted by, <br />C��P.' <br />Parks and Planning Administrator <br />Attachment <br />Prepared by: <br />Denise Johns <br />Park Planner <br />HILLCREST CENTER 403 WEST HILLCREST DRIVE, THOUSAND OAKS, CALIFORNIA 91360-4223 <br />(805) 495-6471 FAX: (805) 497-3199 E-MAIL:parks@crpd.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.