My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
100401
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Minutes
>
2001
>
100401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2016 11:14:31 AM
Creation date
8/11/2016 11:14:15 AM
Metadata
Fields
Template:
Board
Document Type
Minutes
Date
10/4/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 4, 2001 <br />Page 3 <br />for $80,000 in FY '00-01; however, due to discovery of a very wet existing <br />subgrade, it was necessary to enlarge the project in scope and cost; and <br />$160,000 was budgeted in FY'01-02 for the project. <br />In response to Board inquiries, Sorensen said that the cost of services to be <br />provided by Gorian Soils Engineering, Inc. is included in Premier Paving, <br />Inc.'s bid, and no major changes are needed in the existing walkways. <br />It was moved by Berger, seconded by Lange, and carried 4-0 to <br />authorize the General Manager to award a contract to Premier Paving <br />Inc., of Ontario, in the amount of $94,780 and a 10 percent contingency <br />amount of $9,478, for the upper parking lot reconstruction at Conejo <br />Community Center; funds available from Capital Projects Account for <br />CCC#13,804-811-81303-004-10-4. <br />9. ITEMS FOR DISCUSSION <br />10. REPORTS AND ANNOUNCEMENTS <br />A. Status Report — 2001-2002 Capital Improvement Projects <br />Sorensen referenced the documentation and supplied additional information. <br />Dos Vientos Community Park - He said that construction of the community <br />center, restroomlconcession, and maintenance buildings is proceeding <br />rapidly. <br />Dos Vientos School/Park Site D — Sorensen said that this 4.5 -acre <br />neighborhood park site is the last park scheduled for development within the <br />Dos Vientos Specific Plans; the adjacent site is now planned for a middle <br />school instead of an elementary school, resulting in different facility <br />requirements; and it is likely that the park site, in whole or part, will be <br />developed on a site proximate to the school. <br />In response to Board inquiries, Sorensen said that relative to Northwood <br />Park, some members of the focus group do not want an onsite parking lot, <br />and the Board will be involved in that decision. Relative to the Dog Park, <br />staff is confident that the present program to mitigate the recently discovered <br />high chloride levels in the soil will be successful; staff will investigate the <br />need for seeding the park's perimeter; and, in the past, mutt mitts were <br />provided free at several locations, and their use is beneficial to park sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.