My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
SAPWI TRAILS AMENDMENT
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2016
>
030316
>
SAPWI TRAILS AMENDMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2016 1:04:12 PM
Creation date
6/15/2016 1:03:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sapwi Trails Community Park Off -Site Improvements <br />Proposed Scope of Services <br />February 15, 2016 <br />Page 2 of 4 <br />• Irrigation Plans and Details (we assume the off-site irrigation will be metered separately <br />from the park) <br />• Planting Plans and Details <br />Plans will be submitted at 60%, 90%, and Bid Ready stages of completion. <br />We will also prepare book format CSI technical specifications. The Client will provide "front <br />end' specifications (General and Special Provisions), bid form, and will compile the specification <br />book. <br />Deliverable: <br />• Construction Documents (60%, 90%, and Bid Ready) <br />Task C: Offsite Signal Plans <br />RRM Design Group's sub -consultant, fehr and Peers, will prepare signal plans for full <br />signalization of the intersections of 1) Westlake Boulevard and Rainfield Avenue and 2) Avenida <br />De Los Arboles and Kensington Avenue. Signal pians will be prepared to City of Thousand Oaks <br />standards and include electrical service connections, traffic detection and intertie to the City's <br />traffic controls. <br />Plans will be submitted at 60%, 90%, and Bid Ready stages of completion. <br />Deliverable: <br />• Signal Plans, Attendance at One Meeting with City <br />Reimbursable Expenses <br />Incidental expenses incurred by RRM Design Group, or any subconsultant it may hire to <br />perform services for this project, are reimbursed by the client at actual cost plus 10% to cover <br />its overhead and administrative expenses. Reimbursable expenses include, but are not limited to <br />reproduction costs, postage, shipping and handling of drawings and documents, long-distance <br />communications, fees paid to authorities having jurisdiction over the project, the expense of any <br />additional insurance requested by client in excess of that normally carried by RRM Design <br />Group or its subconsultants, travel expenses (transportation/automobile/lodging/meals), <br />renderings and models. Reimbursable automobile travel mileage will be billed at the current IRS <br />business standard mileage rate. <br />Estimated. <br />• $2,500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.