My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
CAPITAL ASSET MAINTENANCE PLAN
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2022
>
102022
>
CAPITAL ASSET MAINTENANCE PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2022 6:50:44 PM
Creation date
10/10/2022 6:50:34 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
10/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
roof at Borchard Community Center needs to be replaced in 2033 at a cost of $125,000 [in 2022 <br />dollars]). <br />New capital projects are identified as part of the District's 10 -Year Capital Improvement Plan and <br />funded via the two-year budget. Typically, total capital replacement of a park or building would be <br />included in the 10 -Year Capital Improvement Plan. To forecast capital spending, the two plans <br />(this 30 -Year Capital Asset Maintenance Plan and the 10 -Year Capital Improvement Plan) should <br />be read together. The current 10 -Year Capital Improvement Plan (Board approved in July 2021) <br />is online at: <br />www. crpd.org110YearC1P <br />It is currently being updated and will be brought to the Board in Spring 2023 as part of the two- <br />year budget process. <br />This 30 -Year Capital Asset Maintenance Plan analyzes and includes capital items in parks or <br />associated with buildings that are not included with regular ongoing maintenance. <br />For parks, eight items are considered: <br />• Lighting • Restrooms <br />• Fencing • Signage <br />• Playground Equipment • Picnic Shelters <br />• Parking Lots • Shade Structures <br />For buildings, sixteen items are considered: <br />• Roofing <br />• Windows <br />• Exterior Siding and Trim <br />• Exhaust Fans <br />• Condensers <br />• Fan Coils <br />• Air Handlers <br />• Kitchen Fire Suppression <br />• Gas -Fired Heaters <br />• Wood Flooring <br />• Vinyl Flooring <br />• Carpet Flooring <br />• Water Heaters <br />• Roll -Up Doors <br />• Exterior Paint <br />• Exterior Lighting <br />Data for 67 facilities, including 53 parks and 14 buildings, is included. Data consists of the original <br />install year, original install cost, quantity, unit, and estimated useful life. From the data input, staff <br />utilizes a factor of 1.25 to forecast an estimated repair/replacement for the asset in the appropriate <br />estimated year. <br />CONCLUSION <br />Staff has comprehensively reviewed the District's capital assets and forecasts an approximate <br />estimate of $31,864,560 (in 2022 dollars) over 30 years for their maintenance. The plan is a <br />
The URL can be used to link to this page
Your browser does not support the video tag.