Laserfiche WebLink
permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, <br />mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that <br />existing. In this project, the improvement will transform approximately 1,250 square feet from mostly <br />existing mulch groundcover into a metal shade structure on concrete paving directly adjacent to the <br />playground. There will be negligible incremental use beyond current overall use of the facility. <br />DISCUSSION <br />Playground improvement project plans are available for Board review and approval at <br />www.crpd.org/play rounds. <br />A Notice Inviting Bids was advertised in the Thousand Oaks Acorn, Construction Bidboard, Inc., Builder's <br />Notebook, Ventura County Contractor's Association, Inc., and posted on the Distriict website. Twelve <br />interested bidders attended the mandatory pre-bid meeting held at the sites on Tuesday, June 8. Five bids <br />were received and were opened at 8:30am on Wednesday, June 30. <br />Vendor <br />Base Bid <br />Ardalan Construction <br />$118281000 <br />G2K Construction <br />$215861890 <br />F.S. Contractors <br />$27060,250 <br />Unlimited Engineering <br />$116937000 <br />Access Pacific <br />$11950)000 <br />The low bid received from Unlimited Engineering Contracting Inc. meets all the required specifications. <br />Unlimited Engineering is a qualified Contractor, with an A — General Engineering contractor and B — <br />General Building Contractor licenses, and has performed projects of similar size and scope; their past <br />projects with the District include playground improvements at Rancho Conejo Playfield, Kimber, and <br />Dos Vientos Neighborhood Parks. <br />Project Financial Status <br />FY 211/22 BUDGET <br />CIP Budgeted Funds <br />Lang Ranch Neighborhood Park Playground Project <br />$ <br />3007000 <br />Additional Appropriation (Unassigned Fund Balance) <br />$ <br />53,000 <br />Triunfo Community Park Playground Project <br />$ <br />2507000 <br />Additional Appropriation (PDF Zone 1) <br />$ <br />971000 <br />Southshore Hills Park Playground Project <br />$ <br />3001000 <br />Additional Appropriation (PDF Zone 1) <br />$ <br />707000 <br />Thousand Oaks Community Park Playground Project <br />$ <br />7157000 <br />_ Additional Appropriation (Unassigned Fund Balance) <br />$ <br />457000 <br />TOTAL BUDGET <br />$ <br />1,830,000 <br />FY 211122 COSTS <br />PAID TO DATE (as of 7/1/2021) <br />$ <br />0 <br />PROJECTED COSTS <br />Construction <br />Unlimited Engineering Contracting Inc. <br />$ <br />176937000 <br />Construction Contingency (Approximately 8%) <br />$ <br />1377000 <br />TOTAL COSTS <br />$ <br />1,830,000 <br />FY 211/22 PROJECTED BALANCE <br />$ <br />0 <br />