Laserfiche WebLink
April 15, 2021 <br />Page 3 <br />1. Authorize the General Manager to enter into a release <br />agreement with G2K Construction, Inc., that is insubstantial <br />compliance with the attached document. <br />2. Determine that, based on its bid withdrawal and release <br />agreement, the G2K Construction, Inc. bid is non-responsive. <br />3. Determine that Builtall Construction bid submittal is non- <br />responsive and reject bid. <br />4. Appropriate $150,000 from Districtwide Fund Balance to Conej <br />Creek West Dog Park Improvement Project (account 62-803 <br />1 <br />811-81004-000). <br />5. As the lowest responsive bidder, award bid to FS Contractors, <br />Inc., contingent upon the execution of the release agreement <br />with G2K Construction, Inc., for $1,249,000 Base Bid, plus <br />contingency in the amount of $79,000, totaling $1,328,000 for <br />construction of parking lot, landscaping, utility connections, <br />pre -fabricated restroom building, and shade structures. <br />B. Consideration of Resolution No. 041521 -A Directing Preparation of the <br />Engineer's Report, Declaring Intention to Levy Assessments for 2021- <br />22, Preliminarily Approving Engineer's Report for Districtwide Park <br />Maintenance and Recreation Improvement District (62-1) and <br />Providing for a Notice of Public Hearing <br />This item was continued to the May 6t" Board Meeting. <br />C. Consideration of Resolution No. 041521-B for Landscaping <br />Maintenance District (LIVID) 92-1 (Rancho Conejo) Preliminarily <br />Approving the Engineer's Report for 2021-2022, Declaring <br />Intention to Provide Annual Levy and Collection of Assessments, and <br />Setting Time and Place for Public Hearing <br />This item was continued to the May 6t" Board Meeting. <br />D. Consideration of Resolution No. 041521-C for Landscaping <br />Maintenance District (LIVID) 94-1 (Dos Vientos) Preliminarily Approving <br />the Engineer's Report for 2021-2022, Declaring Intention to Provide <br />