Since the March 18, 2021 award, staff and representatives from G2K have made efforts to execute the
<br />contract and coordinate the start of the work. During these initial efforts, District staff was presented
<br />alternate shade structures by G2K; staff rejected the submittal as it did not meet the specific bidding
<br />requirements. As the District and G2K could not agree on how to move forward with the project, it was
<br />mutually agreed to enter into a release agreement. The final release agreement was not available at the
<br />time of preparation of this item; the final release agreement will be provided as a supplemental to this item
<br />as soon it is available prior to the April 15, 2021 meeting.
<br />Bids received and opened at 8:30am on Wednesday, March 3rd:
<br />Upon review and consideration of the apparent #2 low bidder, Builtall Construction (BAC), staff
<br />recommends their March 3, 2021 bid be found non-responsive as Addendums 1 and 2 were not
<br />acknowledged per bidding instructions (and as acknowledged by BAC Attachment 1). These addendums
<br />included material and design changes that would affect BAC's price and thus BAC would receive an unfair
<br />competitive advantage if their bid was accepted.
<br />Upon review and consideration of the apparent #3 low bidder, FS Contractors, Inc. (FSC), staff found the
<br />base bid received meets all the required specifications, including the specified shade structures. FSC has
<br />provided written verification that the bid submitted March 3, 2021 is still valid (Attachment 2).
<br />Consistent with its March 18, 2021 recommendation, staff recommends providing a project with (A) Shade
<br />Structures, (B) Parking Lot and Landscaping, and (C) Restroom and Utility Connections but not (D) Bid
<br />Alternate 1: Shade Structures at Walnut Grove and Kimber Parks.
<br />(D)
<br />(C)
<br />Bid Alternate
<br />(A)
<br />(B)
<br />Restroom &
<br />1: Shade
<br />Vendor
<br />Shade
<br />Parking Lot &
<br />Utility
<br />Structures at
<br />(A+B+C)
<br />Structures
<br />Landscaping
<br />Connections
<br />Walnut Grove
<br />Base Bid
<br />& Kimber
<br />Parks
<br />United Construction & Landscape, Inc.
<br />$3403000.00
<br />$7005000.00
<br />$357,000.00
<br />$128,000.00
<br />$11397,000.00
<br />Solex Construction, Inc.
<br />$126,500.00
<br />$1,1963000.00
<br />$923500.00
<br />$145,000.00
<br />$1,415,000.00
<br />Builtall Construction
<br />$46,646.55
<br />$621,321.00
<br />$505,610.00
<br />$311,000.00
<br />$15173,577.55
<br />G2K Construction, Inc.
<br />$1901000.00
<br />$4853000.00
<br />$4241000.00
<br />$1295000.00
<br />$13099,000.00
<br />Ace Construction
<br />$365,338.54
<br />$652,432.23
<br />$627,484.09
<br />$843305.35
<br />$156451254.86
<br />Landscape Support Services
<br />$404,877.00
<br />$619,965.00
<br />$463,081.00
<br />$1245194.00
<br />$13487,923.00
<br />C.S. Legacy Construction, Inc.
<br />$3871461.00
<br />$944,414.00
<br />$119)371.00
<br />$873158.00
<br />$13451,246.00
<br />FS Contractors, Inc.
<br />$324)000.00
<br />$437, 000.00
<br />$488)000.00
<br />$643000.00
<br />$1)249)000.00
<br />Access Pacific, Inc.
<br />$359,400.00
<br />$5033825.00
<br />$5471600.00
<br />$1293720.00
<br />$13410,825.00
<br />Upon review and consideration of the apparent #2 low bidder, Builtall Construction (BAC), staff
<br />recommends their March 3, 2021 bid be found non-responsive as Addendums 1 and 2 were not
<br />acknowledged per bidding instructions (and as acknowledged by BAC Attachment 1). These addendums
<br />included material and design changes that would affect BAC's price and thus BAC would receive an unfair
<br />competitive advantage if their bid was accepted.
<br />Upon review and consideration of the apparent #3 low bidder, FS Contractors, Inc. (FSC), staff found the
<br />base bid received meets all the required specifications, including the specified shade structures. FSC has
<br />provided written verification that the bid submitted March 3, 2021 is still valid (Attachment 2).
<br />Consistent with its March 18, 2021 recommendation, staff recommends providing a project with (A) Shade
<br />Structures, (B) Parking Lot and Landscaping, and (C) Restroom and Utility Connections but not (D) Bid
<br />Alternate 1: Shade Structures at Walnut Grove and Kimber Parks.