Laserfiche WebLink
Since the March 18, 2021 award, staff and representatives from G2K have made efforts to execute the <br />contract and coordinate the start of the work. During these initial efforts, District staff was presented <br />alternate shade structures by G2K; staff rejected the submittal as it did not meet the specific bidding <br />requirements. As the District and G2K could not agree on how to move forward with the project, it was <br />mutually agreed to enter into a release agreement. The final release agreement was not available at the <br />time of preparation of this item; the final release agreement will be provided as a supplemental to this item <br />as soon it is available prior to the April 15, 2021 meeting. <br />Bids received and opened at 8:30am on Wednesday, March 3rd: <br />Upon review and consideration of the apparent #2 low bidder, Builtall Construction (BAC), staff <br />recommends their March 3, 2021 bid be found non-responsive as Addendums 1 and 2 were not <br />acknowledged per bidding instructions (and as acknowledged by BAC Attachment 1). These addendums <br />included material and design changes that would affect BAC's price and thus BAC would receive an unfair <br />competitive advantage if their bid was accepted. <br />Upon review and consideration of the apparent #3 low bidder, FS Contractors, Inc. (FSC), staff found the <br />base bid received meets all the required specifications, including the specified shade structures. FSC has <br />provided written verification that the bid submitted March 3, 2021 is still valid (Attachment 2). <br />Consistent with its March 18, 2021 recommendation, staff recommends providing a project with (A) Shade <br />Structures, (B) Parking Lot and Landscaping, and (C) Restroom and Utility Connections but not (D) Bid <br />Alternate 1: Shade Structures at Walnut Grove and Kimber Parks. <br />(D) <br />(C) <br />Bid Alternate <br />(A) <br />(B) <br />Restroom & <br />1: Shade <br />Vendor <br />Shade <br />Parking Lot & <br />Utility <br />Structures at <br />(A+B+C) <br />Structures <br />Landscaping <br />Connections <br />Walnut Grove <br />Base Bid <br />& Kimber <br />Parks <br />United Construction & Landscape, Inc. <br />$3403000.00 <br />$7005000.00 <br />$357,000.00 <br />$128,000.00 <br />$11397,000.00 <br />Solex Construction, Inc. <br />$126,500.00 <br />$1,1963000.00 <br />$923500.00 <br />$145,000.00 <br />$1,415,000.00 <br />Builtall Construction <br />$46,646.55 <br />$621,321.00 <br />$505,610.00 <br />$311,000.00 <br />$15173,577.55 <br />G2K Construction, Inc. <br />$1901000.00 <br />$4853000.00 <br />$4241000.00 <br />$1295000.00 <br />$13099,000.00 <br />Ace Construction <br />$365,338.54 <br />$652,432.23 <br />$627,484.09 <br />$843305.35 <br />$156451254.86 <br />Landscape Support Services <br />$404,877.00 <br />$619,965.00 <br />$463,081.00 <br />$1245194.00 <br />$13487,923.00 <br />C.S. Legacy Construction, Inc. <br />$3871461.00 <br />$944,414.00 <br />$119)371.00 <br />$873158.00 <br />$13451,246.00 <br />FS Contractors, Inc. <br />$324)000.00 <br />$437, 000.00 <br />$488)000.00 <br />$643000.00 <br />$1)249)000.00 <br />Access Pacific, Inc. <br />$359,400.00 <br />$5033825.00 <br />$5471600.00 <br />$1293720.00 <br />$13410,825.00 <br />Upon review and consideration of the apparent #2 low bidder, Builtall Construction (BAC), staff <br />recommends their March 3, 2021 bid be found non-responsive as Addendums 1 and 2 were not <br />acknowledged per bidding instructions (and as acknowledged by BAC Attachment 1). These addendums <br />included material and design changes that would affect BAC's price and thus BAC would receive an unfair <br />competitive advantage if their bid was accepted. <br />Upon review and consideration of the apparent #3 low bidder, FS Contractors, Inc. (FSC), staff found the <br />base bid received meets all the required specifications, including the specified shade structures. FSC has <br />provided written verification that the bid submitted March 3, 2021 is still valid (Attachment 2). <br />Consistent with its March 18, 2021 recommendation, staff recommends providing a project with (A) Shade <br />Structures, (B) Parking Lot and Landscaping, and (C) Restroom and Utility Connections but not (D) Bid <br />Alternate 1: Shade Structures at Walnut Grove and Kimber Parks. <br />