My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
CAPITAL ASSET MAINTENANCE PLAN
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2020
>
101520
>
CAPITAL ASSET MAINTENANCE PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2020 1:39:02 PM
Creation date
10/7/2020 1:38:37 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
10/15/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
New capital projects are identified as part of the District's 10 -Year Capital Improvement Plan and <br />funded via the two-year budget. Total capital replacement of a park or building would typically be <br />included in the 10 -Year Capital Improvement Plan. To forecast capital spending, the two plans <br />(this 30 -Year Capital Asset Maintenance Plan and the 10 -Year Capital Improvement Plan) should <br />be read together. The current 10 -Year Capital Improvement Plan (Board approved in July 2019) <br />is online at: <br />It is currently in the process of being updated and will be brought to the Board in Spring 2021 as <br />part of the two-year budget process. <br />This 30 -Year Capital Asset Maintenance Plan analyzes and includes capital items in parks or <br />associated with buildings that are not included with regular ongoing maintenance. <br />For parks, eight items are considered: <br />• Lighting • Restrooms <br />• Fencing • Signage <br />• Playground Equipment • Picnic Shelters <br />• Parking Lots • Shade Structures <br />For buildings, sixteen items are considered: <br />• Roofing <br />• Windows <br />• Exterior Siding and Trim <br />• Exhaust Fans <br />• Condensers <br />• Fan Coils <br />• Air Handlers <br />• Kitchen Fire Suppression <br />• Gas -Fired Heaters <br />• Wood Flooring <br />• Vinyl Flooring <br />• Carpet Flooring <br />• Water Heaters <br />• Roll -Up Doors <br />• Exterior Paint <br />• Exterior Lighting <br />Data for 67 facilities, including 53 parks and 14 buildings, is included. Data consists of the original <br />install year, original install cost, quantity, unit, and estimated useful life. From the data inputted, <br />staff utilizes a factor of 1.25 to forecast an estimated repair/replacement for asset in the <br />appropriate estimated year. <br />CONCLUSION <br />Staff has comprehensively reviewed the District's capital assets and forecasts an estimated <br />$27,092,268 (in 2020 dollars) over 30 years for their maintenance. The plan is a valuable <br />additional tool in developing budgets and staff will update the plan every two years in conjunction <br />with the two-year budget cycle. <br />
The URL can be used to link to this page
Your browser does not support the video tag.