My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
CIP REPORT
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2020
>
050720
>
CIP REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 12:00:52 PM
Creation date
4/27/2020 11:59:22 AM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
5/7/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RENOVATE r' <br />Nrrnrrl �. + ✓ <br />i -_s vrrr,rr) <br />_�N.avctcr(ttK ' ' <br />AND =RIDGE FEATURE- <br />' yam. <br />KtMCVA1 tHP- t=;,a__ `r •I'._" <br />RE_D AS NEEDED. <br />E�,11>ZrFL RCU _A7 ON <br />j ki y <br />7 r_ lil EUILCIt 3, ' Y <br />N:_V(PdAll E`1111(C�I2(lU'dUr �•,` yJ-' - <br />A� <br />Park Design <br />Conejo Community Center/Park <br />Initial public and stakeholder assessment meetings <br />have been held. With the provided feedback, <br />guiding priorities have been developed for a <br />renovation of park features and new center <br />building. Staff is currently soliciting a Request for <br />Proposal of environmental and design services. <br />For more information, visit <br />www.crpd.org/cccproject. <br />Parking Lot Renovations <br />Districtwide <br />Eleven parking lots have been selected to be <br />repaired, resurfaced and striped. The City of <br />Thousand Oaks and District staff have coordinated <br />the project as part of the citywide street paving <br />project. Work is estimated to start late Spring 2020 <br />and continue through Summer 2020. <br />Center Design & Renovation <br />Teen Center & Goebel Adult Center <br />Plans are being prepared for permits and <br />bidding for renovation of restrooms at both <br />centers, Adult Center horseshoe pit area <br />improvements, new shaded outdoor fitness <br />area, and Teen Center improvements <br />including gym ceiling, kitchen remodel, new <br />programmable "backyard" of the center <br />building, multi -use court, shaded picnic area, <br />stage, skate plaza, passive seating, and <br />outdoor activity/classroom areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.