Laserfiche WebLink
GENERAL MANAGER <br />Jim Friedl <br />DATE: <br />TO: <br />FROM: <br />SUBJECT: <br />C@nR@ <br />December 3, 2015 <br />Board of Directors <br />Jim Friedl, General Manager <br />BOARD OF DIRECTORS <br />Ed Jones, Chair <br />Chuck Huffer, Vice Chair <br />George Lange, Director <br />Susan L. Holt, Director <br />Joe Gibson, Director <br />GENERAL MANAGER EMERITUS <br />Tex Ward <br />Award Bid for North Ranch Neighborhood Park Reclaimed Irrigation Water <br />Project <br />RECOMMENDATION <br />1. Appropriate $40,000 from Turf Conversion Accounts. <br />2. Award bid to United Construction and Landscape, Inc. for $316,600 (Base Bid <br />$186,600 plus Add Alternate #1 $130,000) plus contingency in the amount of <br />$28,400, totaling $345,000 for irrigation equipment modification from potable to <br />reclaimed water irrigation system, including new reclaimed water mainline and pump <br />installation, backflow removal, existing valves, heads, mainline, and drinking fountain <br />modification, installation of new potable water line, turf renovation and mulch <br />groundcover installation. <br />BACKGROUND <br />This project was previously advertised and bid; two bids were received with one being <br />determined unresponsive. Thus, on October 15, 2015, the Board of Directors voted to <br />re -bid the project due to the lack of bids. <br />A Notice Inviting Bids was advertised in the Ventura County Star, Construction <br />Bidboard, Inc., Builder's Notebook, Ventura County Contractor's Association, Inc., and <br />posted on the District website. Four interested bidders attended the mandatory pre-bid <br />meeting held at the site on Monday, November 2nd, in addition to the seven interested <br />bidders that attended the previous mandatory pre-bid meeting Tuesday, October 1$t. <br />Four bids were received and were opened at 10:00 a.m. on Tuesday, November 24th. <br />Vendor <br />Bid Price <br />Add Alternate #1* <br />Landscape Support Services _ <br />$237,166.00 <br />$157,614.00 <br />STL Landscape, Inc. <br />$275,000.00 <br />$260,000.00 <br />United Construction & Landscape, Inc. <br />$186,600.00 <br />$130,000.00 <br />Marina Landscape, Inc. <br />$295,000.00 <br />$155,000.00 <br />"Add Alternate #1-- Turf renovation and mulch groundcover installation <br />403 West Hillcrest Drive I Thousand Oaks, CA 91360-4223 <br />(805) 495-6471 FAX: (805) 497-3199 Email: parks@crpd.org <br />