My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
072309
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2009
>
072309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2017 4:46:56 PM
Creation date
6/27/2017 4:31:15 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
7/23/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ILANG RANCH COMMUNITY PARK d . <br />DESIGN DEVELOPMENT AND' 3 <br />CONSTRUCTION DOCUMENTS tope of Se, C� <br />1 <br />lighting shall be per Musco Lighting Consultants. All aspects of codes, <br />wiring and foot-candle requirements shall be the responsibility of the <br />''L. NeWman Client's Electrical Engineer. <br />Design Group, Inc. ► Provide specifications for irrigation, planting and construction as they <br />relate to LNDG scope of work <br />► Provide a final cost estimate <br />(continued) ► Provide time for meetings. Meetings out of the office are charged from <br />portal to portal <br />► Submit to Public Agencies for approval and make reasonable changes. <br />Any unreasonable changes will need to be negotiated with Psomas <br />and/or the District (CRPD) <br />Bid Process and Site Construction Assistance <br />LNDG shall allow time to interpret the drawings with the' contractor <br />and Client (CRPD), attend bid meetings and draft correspondence and <br />addenda. <br />1 LNDG shall provide assistance during construction to the Construction <br />Management Company hired by CRPD. <br />► LNDG shall allow time to review and approve all trees 36" box <br />and larger at a contractor or architect -selected source. LNDG shall <br />also allow time to review and approve all.other plant material via <br />photograph submittals prior to delivery. <br />1 LNDG shall allow time to check the landscape and irrigation for <br />compliance to the approved plans and to submit compliance letters to <br />the City, CRPD and Psomas. <br />Exclusions <br />► Pian Check Fees, Permit Fees and Landscape Review Fee; as may <br />be required by the governing public authorities (including fees of <br />consultants hired by those authorities) <br />► Reproductions of Landscape Drawings and Specifications, computer <br />related costs (i.e. plotting, disks, etc.)_ An allowance is provided as t <br />cost plus 15% handling fee <br />► Record Drawings and Specifications <br />► Instrumental Engineering Field Survey <br />1 Changes in the Drawings, Reports and Sketches Requested and <br />Authorized by Psomas <br />► Landscape Observations (over and above those hours mentioned <br />herein) <br />► Meetings (over and above those hours mentioned herein) <br />PSOMAS Scope of Service 1 LNewman Design Group — 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.