Laserfiche WebLink
LANG RANCH COMMUNffY PARK <br />A <br />DESIGN. DEVELOPMENT AND'. <br />mpe- <br />r CQNSTRUCTION DOCUMENTS <br />P S 0 M A S <br />Street Improvement Plans <br />$ 18,120 <br />(continued) Erbes Road at Avenida de Los Arboles <br />Drafting <br />0 <br />$ <br />Design Engineer <br />0 <br />$ <br />- <br />Westiake Boulevard and Rainfield Avenue <br />Drafting <br />50 <br />128 $ <br />6,400 <br />Design Engineer <br />30 <br />132 $ <br />3,960 <br />Westlake Boulevard Sidewalks <br />Drafting <br />40 <br />128 $ <br />5,120 <br />Design Engineer <br />20 <br />132 $ <br />2,640 <br />Signage and Striping Plans <br />$ 5,184 <br />Erbas Road at Avenida de Los Arboles <br />Drafting <br />0 <br />$ <br />Design Engineer <br />0 <br />$ <br />Westlake Boulevard and Rainf:e!d Avenue <br />Drafting <br />25 <br />128 $ <br />3,200 <br />Design Engineer <br />15 <br />132 $ <br />1,980 <br />Off-site Sewer Plans <br />$ 11,880 <br />Drafting <br />40 <br />128 $ <br />5,120 <br />Design Engineer <br />30 <br />132 $ <br />3,960 <br />Project Engineer <br />16 <br />175 $ <br />2,800 <br />Erosion Control Plan - Rough Grade <br />$ 5.200 <br />Drafting <br />20 <br />128 $ <br />2,560 <br />Design Engineer <br />20 <br />132 $ <br />2,640 <br />` Erosion Control Plan - Fine Grade <br />$ 5+200 <br />Drafting <br />20 <br />128 $ <br />2,560 <br />Design Engineer <br />20 <br />132 $ <br />2,840 <br />Storm Water Pollution Prevention Plan <br />$ 4,200 <br />Project Assistant <br />20 <br />78 $ <br />1,560 <br />Design Engineer <br />20 <br />132 $ <br />2,640 <br />Storm Water Quality Urban Impact Mitigation Plan <br />$ 5,520 <br />Project Assistant <br />20 <br />78 $ <br />1,560 <br />Design Engineer <br />30 <br />132 S <br />3,960 <br />Project Management and Coordination <br />$ 65,770 <br />Project Assistant <br />105 <br />78 $ <br />8,190 <br />Project Engineer <br />65 <br />132 $ <br />8,580 <br />Project Manager <br />280 <br />175 $ <br />49,000 <br />Quality Assurance/Quality Control <br />$ 25,540 <br />Drattfng <br />35 <br />126 $ <br />4,460 <br />Design Engineer <br />80 <br />132 $ <br />10,560 <br />P%ect Engineer <br />60 <br />175 $ <br />10,500 <br />Physical Model of Proposed Park Site <br />$ 22,000 <br />4.51 x 3.5-80 scale model <br />1 <br />LS $ <br />12,000 <br />Time and Materials for 3D model elements <br />t <br />LS $ <br />10,000 <br />Project Funding Opportunkles Research <br />$ 7,000 <br />Project, Manager <br />40 <br />175 $ <br />7,000 <br />Construction Support Services <br />$ 27,460 <br />Drafting <br />20 <br />128 $ <br />2,560 <br />Project Manager <br />140 <br />175 $ <br />24,500 <br />PSOMAS <br />Compensation - 63 <br />