My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
MINUTES
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2015
>
050715
>
MINUTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2016 4:12:42 PM
Creation date
8/16/2016 4:12:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April 16, 2015 <br />Page 2 <br /> <br />It was moved by Holt, seconded by Lange, and carried 5-0 to approve the <br />Consent Calendar as presented. <br /> <br />7. DEFERRED MATTERS <br /> <br /> A. Public Hearing Preliminary Budget Fiscal Year 2015-2016/2016-2017 <br /> <br /> Jones opened the public hearing. There was no public comment; the hearing is <br />continued to the next Board meeting on May 7, 2015. <br /> <br />8. ITEMS FOR DISCUSSION <br /> <br />9. NEW ITEMS <br /> <br />A. Consideration of Resolution No. 041615-A Directing Preparation of the <br />Engineer’s Report, Declaring Intention to Levy Assessments for 2015-16, <br />Preliminarily Approving Engineer’s Report for Districtwide Park Maintenance and <br />Recreation Improvement District (62-1) and Providing For a Notice of Public <br />Hearing <br /> <br /> Hare reported this assessment rate is increasing from $34.42 to $34.67. He will bring a <br />detailed report back to the Board in May which will include what projects this <br />assessment will support. Gibson recommends adjusting capital projects to reflect a <br />change in how the District treats landscaping and water costs. Additionally, Gibson <br />stated the draft report makes reference to older projects; certain language needs to be <br />updated and revised before the final report is presented. <br /> <br /> It was moved by Gibson, seconded by Holt, and carried 5-0 to adopt Resolution <br />No. 041615-A directing preparation of the Engineer’s Report, declaring the <br />District’s intention to levy assessments for 2015-16, preliminarily approving the <br />Engineer’s Report for Districtwide Park Maintenance and Recreation <br />Improvement District (62-1) and providing for a notice of public hearing, that it be <br />read in title only and all further readings be waived. <br /> <br /> B. Consideration of Resolutions 041615-B and 041615-C for Landscaping <br />Maintenance Districts (LMDs) 92-1 and 94-1 <br /> <br />Hare reported the assessment rate for LMD 92-1 is increasing from $70.78 to $78.12 <br />and for LMD 94-1 from $299.00 to $299.89. Gibson suggested modifying some <br />language to incorporate the District’s water-saving activities. <br /> <br />1. It was moved by Gibson, seconded by Huffer, and carried 5-0 to adopt <br />Resolution 041615-B (Rancho Conejo) for LMD 92-1, that it be read in title <br />only and all further readings be waived; and <br /> <br />2. It was moved by Gibson, seconded by Huffer, and carried 5-0 to adopt
The URL can be used to link to this page
Your browser does not support the video tag.