Laserfiche WebLink
DRAFT U date to Cone'oRPD Strategic Pian — "Track Changes") Version <br />Ju1Y 7.2016 <br />prOvj cL2 vY cw -►Je-S -Cvr <br />2.5 Maintain a capital improvement fund. Incentivize• groups to improve District <br />facilities through a grant funding application program for District approved projects. <br />(See also Finance section 3.2.6). <br />2.6 Annually evaluateContinue the District's progress toward greater environmental <br />stewardship and "sustainable" operations. <br />2.6. 1 _Incorporate environmentally sensitive and energy efficient design and <br />recycled, <br />renewable or otherwise sustainable materials in parks and facilities. <br />2.6.2 Seek opportunities to utilize "green" or alternate energy. <br />2.6.3 Conserve water and favor California native and drought tolerant <br />landscagina. <br />2.7 Evaluate and incorporate improved accessibility to existing and new parks and <br />facilities. Gamprehensively-fRequiarly evaluate existing parks and facilities to provide <br />improved access by assistive equipment such as alternative mobility equipment. <br />2.8 implement shoFt, medium, and ,eRg term measures <br />,wr..sur s to Eenhance recreational <br />opportunities for "A�tt►e-Adults" (aka "Seniors"). <br />o Id-�r <br />2.9 Continue to incorporate water saving practices into standard operations. Follow <br />through with drought -related turf conversions in the parks and consider and i1mplement <br />a variety of cost effective water -saving solutions. oppeFtunites sweh as, but n t limited <br />Com" I <br />2.10 Seek input, ideas and solutions from the pdbtie to examine potential for <br />additional locations for off -leash dog areas and :o e s eff-rtm a and s usta-Ra le <br />14 <br />