GENERAL MANAGER
<br />Jim Friedl
<br />DATE:
<br />TO:
<br />FROM:
<br />SUBJECT:
<br />C(DR 13@
<br />February 4, 2016
<br />Board of Directors
<br />Jim Friedl, General Manager
<br />BOARD OF DIRECTORS
<br />Chuck Huffer, Chair
<br />George Lange, Vice Chair
<br />Susan L. Holt, Director
<br />Joe Gibson, Director
<br />Ed Jones, Director
<br />GENERAL MANAGER EMERITUS
<br />Tex Ward
<br />Award Bid for Waverly Neighborhood Park Play Area Renovation and Turf
<br />Conversion Project
<br />RECOMMENDATION
<br />1. Appropriate $20,000 from Turf Conversion Accounts.
<br />2. Award bid to FS Contractors, Inc. for $281,500 (Base Bid $190,000 plus Add
<br />Alternate #1A Concrete Path $26,500 and #213 Turf Conversion Area $65,000) plus
<br />contingency in the amount of $27,040, totaling $310,000 for removal of existing play
<br />equipment, concrete paving, timber walls and steps, installation of new play and
<br />fitness equipment, modification to existing irrigation system and installation of new
<br />irrigation, planting, turf renovation and mulch groundcover installation.
<br />BACKGROUND
<br />A Notice Inviting Bids was advertised in the Ventura County Star, Construction
<br />Bidboard, Inc., Builder's Notebook, Ventura County Contractor's Association, Inc., and
<br />posted on the District website. Seventeen interested bidders attended the mandatory
<br />pre-bid meeting held at the site on Thursday, January 7th. Ten bids were received and
<br />were opened at 10:00 a.m. on Tuesday, January 26th
<br />Vendor
<br />Bid Pace
<br />Add Alt. #!A*
<br />Add Alt. #2s**
<br />Ardalan Construction Co.
<br />$ 292,200
<br />$
<br />53,000
<br />$ 216,000
<br />United Construction & Landscape, Inc.
<br />$ 324,900
<br />$
<br />68,400
<br />$ 299,000
<br />Unlimited Engineering Contracting
<br />$ 208,500
<br />$
<br />30,000
<br />$ 99,000
<br />GMZ Engineering _
<br />$ 279,300
<br />$
<br />35,000
<br />$ 100,000
<br />Hughes General Engineering
<br />$ 334,370
<br />$
<br />62,788
<br />$ 271,340
<br />Access Pacific
<br />$ 291,124
<br />$
<br />60,000
<br />$ 168,750
<br />FS Contractors, Inc.
<br />$ 190,000
<br />$
<br />26,500
<br />$ 65,000
<br />Mariposa Landscapes
<br />$ 386,543
<br />$
<br />58,262
<br />$ 403,600
<br />California Landscape & Design
<br />$ 605,140
<br />$
<br />49,099
<br />$ 424,447
<br />EJS, Inc.
<br />$ 365,700
<br />$
<br />84,000
<br />$ 339,500
<br />* Add Alternate #1A - Concrete walking path
<br />**Add Alternate #2B - Turf conversion area - 6" depth mulch groundcover installation
<br />403 West Hillcrest Drive I Thousand Oaks, CA 913604223
<br />(805) 495-6471 FAX: (805) 497-3199 Email: parks@crpd.org