Laserfiche WebLink
GENERAL MANAGER <br />Jim Friedl <br />DATE: <br />TO: <br />FROM: <br />SUBJECT: <br />C(DR 13@ <br />February 4, 2016 <br />Board of Directors <br />Jim Friedl, General Manager <br />BOARD OF DIRECTORS <br />Chuck Huffer, Chair <br />George Lange, Vice Chair <br />Susan L. Holt, Director <br />Joe Gibson, Director <br />Ed Jones, Director <br />GENERAL MANAGER EMERITUS <br />Tex Ward <br />Award Bid for Waverly Neighborhood Park Play Area Renovation and Turf <br />Conversion Project <br />RECOMMENDATION <br />1. Appropriate $20,000 from Turf Conversion Accounts. <br />2. Award bid to FS Contractors, Inc. for $281,500 (Base Bid $190,000 plus Add <br />Alternate #1A Concrete Path $26,500 and #213 Turf Conversion Area $65,000) plus <br />contingency in the amount of $27,040, totaling $310,000 for removal of existing play <br />equipment, concrete paving, timber walls and steps, installation of new play and <br />fitness equipment, modification to existing irrigation system and installation of new <br />irrigation, planting, turf renovation and mulch groundcover installation. <br />BACKGROUND <br />A Notice Inviting Bids was advertised in the Ventura County Star, Construction <br />Bidboard, Inc., Builder's Notebook, Ventura County Contractor's Association, Inc., and <br />posted on the District website. Seventeen interested bidders attended the mandatory <br />pre-bid meeting held at the site on Thursday, January 7th. Ten bids were received and <br />were opened at 10:00 a.m. on Tuesday, January 26th <br />Vendor <br />Bid Pace <br />Add Alt. #!A* <br />Add Alt. #2s** <br />Ardalan Construction Co. <br />$ 292,200 <br />$ <br />53,000 <br />$ 216,000 <br />United Construction & Landscape, Inc. <br />$ 324,900 <br />$ <br />68,400 <br />$ 299,000 <br />Unlimited Engineering Contracting <br />$ 208,500 <br />$ <br />30,000 <br />$ 99,000 <br />GMZ Engineering _ <br />$ 279,300 <br />$ <br />35,000 <br />$ 100,000 <br />Hughes General Engineering <br />$ 334,370 <br />$ <br />62,788 <br />$ 271,340 <br />Access Pacific <br />$ 291,124 <br />$ <br />60,000 <br />$ 168,750 <br />FS Contractors, Inc. <br />$ 190,000 <br />$ <br />26,500 <br />$ 65,000 <br />Mariposa Landscapes <br />$ 386,543 <br />$ <br />58,262 <br />$ 403,600 <br />California Landscape & Design <br />$ 605,140 <br />$ <br />49,099 <br />$ 424,447 <br />EJS, Inc. <br />$ 365,700 <br />$ <br />84,000 <br />$ 339,500 <br />* Add Alternate #1A - Concrete walking path <br />**Add Alternate #2B - Turf conversion area - 6" depth mulch groundcover installation <br />403 West Hillcrest Drive I Thousand Oaks, CA 913604223 <br />(805) 495-6471 FAX: (805) 497-3199 Email: parks@crpd.org <br />