My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
TEEN GACC CHANGE ORDER SUMMARY
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2022
>
102022
>
TEEN GACC CHANGE ORDER SUMMARY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 4:43:06 PM
Creation date
10/20/2022 4:43:04 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
10/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TEEN / ADULT CENTER IMPROVEMENTS - CHANGE ORDER SUMMARY - OCTOBER 20, 2022 <br />CHANGE ORDER ITEM DATE DESCRIPTION TOTAL COSTS <br />Change Order #1 April 1, 2022 1.) Additional demolition of wall and replacement with 75,000$ <br />expanded paving and fencing (Teen) ($35,000) <br />2.) Connect existing downspouts to new site drainage <br />(Teen/Adult) ($18,000) <br />3.) Ground-breaking event equipment and staff (Teen/Adult) <br />4.) Onsite adjustments for sewer connection for kitchen (Teen) <br />($9,000) <br />5.) Horse pit rebuild and benches (Adult) <br />Change Order #2 May 11, 2022 1.) Repair wall from relocated drinking fountain (Teen)135,000$ <br />2.) Demolition and replace restroom floors due to poor condition <br />(Teen) ($26,000) <br />3.) Additional extrior wall depth and rolling gate scope due to site <br /> conditions (Teen) <br />4.) Remove and replace Lupine Room floor drains, sinks and <br />cabinets due to poor working condition (Adult) ($18,000) <br />5.) Replace water damaged plywood wall in kitchen (Teen) <br />6.) Correct Lupine Room floor and framing for proper door <br />install (Adult) ($24,000) <br />7.) Relocate HVAC equipment due to existing site conflict <br /> (Teen) ($15,000) <br />Change Order #3 June 9, 2022 1.) Remove and replace drains and doors (Teen)180,000$ <br />2.) Provide dye to concrete floor to match blemishes with <br /> overall floor (Teen) <br />3.) Replumb main restrooms and provide new fixtures <br />(Adult) ($83,000) <br />4.) Review and update fire systems due to unknown <br />conflict with new improvements (Teen/Adult) ($52,000) <br />5.) Adjust doors at main hall to accomodate new floor (Adult) <br />Change Order #4 July 25, 2022 1.) Provide additional lighting fixtures and electrical work (Teen)145,000$ <br />2.) Raise main partition door at Main Hall due to new floor height <br />(Adult) ($34,000) <br />3.) Additional decorative panel and lighting due to shade structure <br />relocation (Teen) ($52,000) <br />4.) Additional security/safety fence at skate area (Teen) ($13,000) <br />5.) Additional access panels due to plumbing changes (Teen/Adult) <br />6.) Reroute irrigation mainline at fitness area to not conflict (Adult) <br />Change Order #5 August 8, 2022 1.) Rubber and court surfacing price increase (Teen/Adult)115,000$ <br />Due to Shade Permit Delay 2.) Shade structure price increase (Teen/Adult) ($34,000) <br />3.) Additional soil preparation (Teen/Adult) <br />4.) Additional costs for exterior improvements including <br />demobilization and remobilization (Teen/Adult) ($58,000) <br />Change Order #6 September 7, 2022 1.) Misc improvements including exterior curbing, electrical, 115,000$ <br />drinking fountain and doors (Teen/Adult) ($50,000) <br />2.) Expand bubbler irrigation for Teen parking lot area and <br />provide updated backflow devices (Teen/Adult) ($24,000) <br />3.) Upgrade trough sinks (Teen/Adult) ($30,000) <br />4.) Modify HVAC unit due to manufacturing conflict with <br />building (Teen) <br />Change Order #7 PENDING 1.) Additional flooring at restroom hallway (Adult)55,000$ <br />2.) Kitchen hood conflict reroute utilities (Teen) <br />3.) Replumb hallway restrooms (Adult) ($32,000) <br />4.) Additional framing at kitchen service window (Teen) <br />5.) Additional curb at fitness area (Adult) <br />Projected Total Costs 820,000$
The URL can be used to link to this page
Your browser does not support the video tag.