TEEN / ADULT CENTER IMPROVEMENTS - CHANGE ORDER SUMMARY - OCTOBER 20, 2022 <br />CHANGE ORDER ITEM DATE DESCRIPTION TOTAL COSTS <br />Change Order #1 April 1, 2022 1.) Additional demolition of wall and replacement with 75,000$ <br />expanded paving and fencing (Teen) ($35,000) <br />2.) Connect existing downspouts to new site drainage <br />(Teen/Adult) ($18,000) <br />3.) Ground-breaking event equipment and staff (Teen/Adult) <br />4.) Onsite adjustments for sewer connection for kitchen (Teen) <br />($9,000) <br />5.) Horse pit rebuild and benches (Adult) <br />Change Order #2 May 11, 2022 1.) Repair wall from relocated drinking fountain (Teen)135,000$ <br />2.) Demolition and replace restroom floors due to poor condition <br />(Teen) ($26,000) <br />3.) Additional extrior wall depth and rolling gate scope due to site <br /> conditions (Teen) <br />4.) Remove and replace Lupine Room floor drains, sinks and <br />cabinets due to poor working condition (Adult) ($18,000) <br />5.) Replace water damaged plywood wall in kitchen (Teen) <br />6.) Correct Lupine Room floor and framing for proper door <br />install (Adult) ($24,000) <br />7.) Relocate HVAC equipment due to existing site conflict <br /> (Teen) ($15,000) <br />Change Order #3 June 9, 2022 1.) Remove and replace drains and doors (Teen)180,000$ <br />2.) Provide dye to concrete floor to match blemishes with <br /> overall floor (Teen) <br />3.) Replumb main restrooms and provide new fixtures <br />(Adult) ($83,000) <br />4.) Review and update fire systems due to unknown <br />conflict with new improvements (Teen/Adult) ($52,000) <br />5.) Adjust doors at main hall to accomodate new floor (Adult) <br />Change Order #4 July 25, 2022 1.) Provide additional lighting fixtures and electrical work (Teen)145,000$ <br />2.) Raise main partition door at Main Hall due to new floor height <br />(Adult) ($34,000) <br />3.) Additional decorative panel and lighting due to shade structure <br />relocation (Teen) ($52,000) <br />4.) Additional security/safety fence at skate area (Teen) ($13,000) <br />5.) Additional access panels due to plumbing changes (Teen/Adult) <br />6.) Reroute irrigation mainline at fitness area to not conflict (Adult) <br />Change Order #5 August 8, 2022 1.) Rubber and court surfacing price increase (Teen/Adult)115,000$ <br />Due to Shade Permit Delay 2.) Shade structure price increase (Teen/Adult) ($34,000) <br />3.) Additional soil preparation (Teen/Adult) <br />4.) Additional costs for exterior improvements including <br />demobilization and remobilization (Teen/Adult) ($58,000) <br />Change Order #6 September 7, 2022 1.) Misc improvements including exterior curbing, electrical, 115,000$ <br />drinking fountain and doors (Teen/Adult) ($50,000) <br />2.) Expand bubbler irrigation for Teen parking lot area and <br />provide updated backflow devices (Teen/Adult) ($24,000) <br />3.) Upgrade trough sinks (Teen/Adult) ($30,000) <br />4.) Modify HVAC unit due to manufacturing conflict with <br />building (Teen) <br />Change Order #7 PENDING 1.) Additional flooring at restroom hallway (Adult)55,000$ <br />2.) Kitchen hood conflict reroute utilities (Teen) <br />3.) Replumb hallway restrooms (Adult) ($32,000) <br />4.) Additional framing at kitchen service window (Teen) <br />5.) Additional curb at fitness area (Adult) <br />Projected Total Costs 820,000$