My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
94-1 DOS VIENTOS
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2022
>
050522
>
94-1 DOS VIENTOS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 11:37:36 AM
Creation date
4/29/2022 11:29:38 AM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
5/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conejo Recreation & Park District <br />GENERAL MANAGER <br />Jim Friedl <br />DATE: May 5, 2022 <br />TO: Board of Directors <br />FROM: Jim Friedl, General Mana <br />BOARD OF DIRECTORS <br />Nellie Cusworth, Chair <br />Susan L. Holt, Vice Chair <br />George M. Lange, Director <br />Chuck Huffer, Director <br />Doug Nickles, Director <br />GENERAL MANAGER EMERITUS <br />Tex Ward <br />SUBJECT: Consideration of Resolution 050522-B for Landscaping Maintenance District <br />(LIVID) 94-1 (Dos Vientos) Preliminarily Approving the Engineer's Report for <br />2022-2023, Declaring Intention to Provide Annual Levy and Collection of <br />Assessments, and Setting Time and Place for Public Hearing <br />RECOMMENDATION <br />Adopt Resolution 050522-B preliminarily approving the Engineer's Report for 2022-2023, <br />declaring intention to provide annual levy and collection of assessments, and setting time and <br />place for public hearing. <br />DISCUSSION <br />Assessment District law requires the annual preparation of an Engineer's Report for the purpose <br />of identifying improvements and levying assessments for the maintenance of those <br />improvements. <br />The park maintenance assessment is a partial assessment for overall maintenance and operating <br />(M&O) costs and is based upon the differential between ad valorem property tax received and <br />attributable to park maintenance and the actual maintenance costs. The LMD includes a capita <br />improvement project fund. <br />The attached resolution provides for a noticed Public Hearing of this Board on June 2, 2022 at <br />6:00pm, to consider the ordering of the improvements and the levy of the proposed assessment. <br />The recommended assessment for LMD 94-1 (Dos Vientos Ranch) provides for the maintenance <br />and operation of Dos Vientos Community Park, Del Prado Playfield, and Dos Vientos and <br />Sycamore Neighborhood Parks, as well as the maintenance of the open space surrounding Dos <br />Vientos Ranch. As per the table below, the proposed assessment is changing from $328.66 per <br />benefit unit to $331.28 per benefit unit for FY 2022/23. Based on the 7.399% (capped at 5%) <br />change in CPI from February 2021 to February 2022, the maximum assessment rate within LMD <br />94-1 (Dos Vientos) changes from $351.33 per benefit unit to $368.89 per benefit unit. <br />ADMINISTRATIVE OFFICES <br />403 West Hillcrest Drive, Thousand Oaks, CA 91360-4223 <br />805-495-6471 1 Fax: 805-497-3199 1 parks@crpd.org I www.crpd.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.