My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AMENDMENT 2 AYSO
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2021
>
061721
>
AMENDMENT 2 AYSO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 6:58:45 PM
Creation date
6/10/2021 6:57:22 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
6/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'drub. -mormilb. <br />TM <br />=MVC0WU7Wft <br />FRAME AND PANEL BUILDINGS <br />4240 N 136th Ave <br />Holland, M1 49424 <br />Phone # 800-264-7225 E-mail sales@ miracleplayground.com <br />Fax# 877.215-3869 Web Site www.poligon.com <br />Name/Address <br />Conejo Rec & Park District <br />Amww <br />Date <br />Estimate # <br />1 6/3/2021 <br />4894 <br />1 1 <br />-Purchase orders to be made out to PORTERcorp. <br />-Purchase orders to be emailed/ mailed/faxed to <br />9106 Pulsar Ct #C, Corona Ca 92883 or <br />-877-215-3869, sales@miracleplayground.com <br />-Remittance Address: 4240 N 136th Ave Holland <br />M 149424 <br />Project Terms Rep FOB <br />Conejo Creek So Park Net 30 Brett factory <br />Item Description Qty Rate Total <br />Poligon Poligon Steel Shelter REK30x64MR 1 79,142.30 791142.30T <br />-Gable Roof Steel Shelter 30'x 64' <br />-Multi Rib metal roofing <br />-Electrical access and cutouts <br />-Gutters and downspouts 2 long sides <br />-Poli5000 powdercoated frame <br />-anchor bolts <br />Engineering Wet Stamped Engineering including footings 1 500.00 500.00T <br />Freight Commercial Freight 1 61650.00 61650.00 <br />This quote is valid for 60 days. <br />QUALIFTCATIONS: <br />1. Changes made to the drawings referenced, will be reviewed and may affect pricing. <br />2. Assumes standard Poligon colors from current color chart. <br />3. A checklist of all documents required to place materials into production will be provided <br />by local sales rep when PO is received. ALL items on the checklist must be provided prior <br />to releasing materials for fabrication. <br />TERMS OF PAYMENT: <br />1. Non -municipal customers, orders require 25% deposit prior to schedule of fabrication. <br />2. All Purchase orders must be made out to Portercorp and sent through local sales rep <br />3. Payment agreement terms TBD once PO in placed <br />4. New non -municipal customers need to complete a credit app and initial Poligon terms and <br />conditions document <br />5. Prices are valid for 30 days <br />Page 1 <br />Sales Tax (9.5%) <br />ffeme <br />Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.