My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AMENDMENT 2 AYSO
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2021
>
061721
>
AMENDMENT 2 AYSO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 6:58:45 PM
Creation date
6/10/2021 6:57:22 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
6/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�ONrRacTORs, �Nc <br />14838 BLEDSOE STREET SYLMAR, CA 91342 PHONE: (818) 838-6040 e FAX: (818) 838-6171 <br />CONTRACTOR'S LICENSE #1005940 CLASS A -C8 -C27 o DIR #1000033438 <br />PROPOSAL Revised <br />June 8, 2021 <br />SUBMITTED TO: <br />AYSO Region 9 <br />ATTN: Tom Skaff <br />805.427.5651 <br />skaffhelping. other(a�gmail. com <br />PROJECT: SHADE STRUCTURE INSTALLATION AT THE CONEJO CREEK SOUTH PARK <br />(AYSO Region 9) <br />"This is a prevailing wage project" <br />We hereby propose to furnish All Material, Labor, Equipment and Transportation necessary for the <br />Miscellaneous Work at the above project in accordance with our field discussion; which includes: <br />• Clear and grub an area of approximately 5,136 square feet of existing turf area <br />® Excavate and re -compact subgrade in preparation for the concrete slab <br />• Install 6" of compacted road base <br />• Construct a 34'X84' Concrete slab 6" thick with thicken edge, #4 rebar @ 12" oc/ew. (concrete <br />pump is required) <br />® Install a 30'X64' "Poligon" shade structure supplied by the owner <br />• Fine grade around new slab and install new sod where disturbed (approx. 2,280 SF) <br />O Modify existing irrigation system to accommodate new layout <br />® Install approx. 80' of 1-1/4" electrical conduit with pull rope for future use and adjust existing pull <br />box to new elevation <br />FOR THE SUM OF: $ 1167500.00 <br />EXCLUSIONS: Utility adjustment/relocation, surveying, permit and fees, painting, site <br />furnishings, maintenance, temporary fence and export/import. <br />All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any <br />alterations or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an <br />extra charge over and above the estimate. All agreements are contingent upon strikes, accident, or delays beyond our control. <br />ACCEPTANCE OF PROPOSAL <br />The above prices, specifications and conditions are hereby accepted. You are authorized to do <br />the work as specified. <br />ACCEPTED: <br />Signature_ <br />Date: Title: <br />
The URL can be used to link to this page
Your browser does not support the video tag.