My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
DOS VIENTOS B
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2021
>
050621
>
DOS VIENTOS B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2021 4:41:32 PM
Creation date
4/30/2021 4:34:07 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
5/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*"WILLDAN <br />C. ANNUAL MAINTENANCE COSTS <br />The annual District, maintenance cost budgeted each year is based on the <br />completion and dedication of park facilities and open space areas. The <br />improvements to be maintained between July 1, 2021 and June 30, 2022 include: <br />A <br />Community Park <br />27.80 <br />27.80 <br />$157510 <br />$4317178.00 <br />B <br />Play Field Park <br />13.00 <br />13.00 <br />$167233 <br />2117029.00 <br />C <br />Neighborhood Park <br />5.10 <br />5.10 <br />$121289 <br />62,673.90 <br />D <br />Neighborhood Park <br />4.50 <br />4.50 <br />$12,289 <br />557300.50 <br />Open Space <br />17203.10 <br />1)203.10 <br />$109 <br />1317137.90 <br />The annual maintenance cost for Park Site A is calculated at $15,510 per acre <br />based on its designated use as a Community Park. The annual maintenance cost <br />for Park Site B is calculated at $16,233 per acre based on its designated use as a <br />Play Field Park. The annual maintenance cost for Park Sites C and D is calculated <br />at $12,289 per acre based on their designated use as a Neighborhood Park. The <br />annual maintenance cost for the open space areas is based on average <br />maintenance cost and standard care for similar Conejo Recreation and Park <br />District facilities at $109 per acre. <br />For fiscal year 2021/2022 the total annual maintenance cost includes the full <br />maintenance of Park Sites A, B, C and D, as well as the maintenance of <br />approximately 1,203.10 acres of the anticipated 1,245 acres of open space area. <br />D. CONTRIBUTIONS <br />The parks, open space areas and the facilities within this District were installed as <br />a condition of developing the properties within the District and are maintained and <br />operated for the benefit of those properties, and these improvements require a <br />higher level of service than similar facilities and areas outside of the District. It has <br />also been determined that each and every assessed parcel within the District <br />receives a particular and special benefit from the improvements over and above <br />any general benefit that may be conferred by the improvements to the public at <br />large or to other properties outside the District. However, recognizing that similar <br />improvements exist outside the District boundaries and these improvements may <br />be partially funded by Ad Valorem revenues available to the Conejo Recreation <br />and Park District as well as the fact that the District improvements may <br />occasionally be utilize by others, the Conejo Recreation and Park District may at <br />their discretion, provide a contribution to the District expenses utilizing a portion of <br />the Ad Valorem revenues associated with properties within the District. <br />The Ad Valorem revenue contribution represents the amount of general fund <br />monies the Conejo Recreation and Parks District anticipates it will contribute <br />2021/2022 Landscape Maintenance District No. 94-1 Page 10 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.