My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
DOS VIENTOS B
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2021
>
050621
>
DOS VIENTOS B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2021 4:41:32 PM
Creation date
4/30/2021 4:34:07 PM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
5/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*"WILLDAN <br />2. Internal concrete and decomposed granite walkways, paths with <br />handicapped accessible access points; <br />3. Paved asphalt parking lot and driveways; <br />4. Walkway and parking lot lighting fixtures and planters; <br />5. Drinking fountains; and <br />6. Small service area and storage shed. <br />B. Recreational Facilities <br />1. Three (3) lighted and two (2) unlighted baseball diamonds <br />including grass infields, base paths, chain link backstops and <br />perimeter fences, bleachers, restrooms and equipment building, <br />and equipment storage shed; <br />2. Two (2) volleyball courts with improved sandpits; <br />3. Group picnic area; <br />4. Two (2) playground areas; <br />5. Indoor sports activity building/recreation center; and <br />6. Two (2) tennis courts. <br />II. Park Site B, Required Playfields Park Facilities, 13.0 acres (Completed <br />January, 2013) <br />A. Hardscape and Landscape <br />1. Irrigated and planted play area consisting of grass, shrubbery, and <br />trees; <br />2. Handicapped accessible concrete walkway and decomposed granite <br />jogging path; <br />3. Walkway lighting fixtures and planters; <br />4. Paved parking area with lights; and <br />5. Restrooms. <br />B. Recreation Facilities <br />1. Playground Area; <br />2. A hard surface lighted basketball court; <br />3. Two (2) lighted pickleball courts; and <br />4. One (1) lighted tennis court; and <br />5. Three (3) lighted combined baseball/soccer fields. <br />III. Park Site C, Neighborhood Park Facilities, 5.1 acres (Completed December <br />1998) <br />A. Hardscape and Landscape <br />1. Irrigated and planted play area consisting of grass, shrubbery, and <br />trees; <br />2021/2022 Landscape Maintenance District No. 94-1 Page 6 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.