WORK CENTER BUDGET SUMMARY
<br />DIVISION: Parks and Planning
<br />WORK CENTER: Building Maintenance
<br />ANALYSIS:
<br />'i�X ��' "Y. a;.re}.i:,i.:
<br />r4.. .,.o}.u:.
<br />.-}-;�. °•rY.:.r:,y-
<br />]�. ::>t}:; `:. :�.i
<br />$ 2,700
<br />:.u{0.O wa4'^' ..{.:0. �- �• .i
<br />'•:,-0vJS}�G jr •:-f0'". r
<br />,•..•Y:U
<br />� �4:r✓4 � .%4,{r
<br />l 'Y;v
<br />Oi?tia A:'
<br />¢i'
<br />::}}:
<br />.it:: :9¢. 4'. ".F•. v }'a\ .:.} :.:Y
<br />'-0Lti4:w.. ..:}].vY:
<br />:4]:. Y: 4.'.
<br />.:�. :4xG
<br />Paint Room 16, main hall, and entrance
<br />2,000
<br />TOC
<br />Paint lounge and crafts room
<br />2,500
<br />OPS
<br />Whole Access Trail: paint restroom, repair and
<br />4,500
<br />$456,426
<br />$467,505
<br />$496,206
<br />$457,964
<br />$516,828
<br />195,974
<br />179,554
<br />179,150
<br />168,289
<br />199,100
<br />.y
<br />1,650
<br />3,969
<br />6,200
<br />6,568
<br />7,700
<br />rlr x.O:+:�o .Oi.'`•4:0 - •n vv": v,•,h,
<br />$654,050
<br />$651,028
<br />$681,556
<br />$632,821
<br />$723,628
<br />ANALYSIS:
<br />BOP Replace restroom partitions with Santana Product (A building) 3,500
<br />BOP Replace restroom partitions with Santana Product (BDS) 2,800
<br />CCC Replace mini -blinds in Room 2 and preschool 600
<br />OMC Replace counter top 2,000
<br />BOC Install stairs at storage area 2,500
<br />OMC Install new carpet 3,500
<br />BOC Replace kitchen counter 1,200
<br />TOTAL $ 34,300
<br />Capital Outlay:
<br />Sorter/feeder for copier $ 1,500
<br />The 2001-2002 Budget represents a 6.2 percent increase over the 2000-2001 Budget
<br />* A glossary of the three letter codes is attached as Appendix A.
<br />wcs-p-bm
<br />52.
<br />Milior Repairs**
<br />CRB
<br />Employee time clocks Psat two) $1,350 each
<br />$ 2,700
<br />CCP
<br />TOC
<br />Replace outside storage door
<br />3,000
<br />STI
<br />Paint schoolhouse
<br />3,500
<br />BOC
<br />Paint Room 16, main hall, and entrance
<br />2,000
<br />TOC
<br />Paint lounge and crafts room
<br />2,500
<br />OPS
<br />Whole Access Trail: paint restroom, repair and
<br />4,500
<br />maintenance of trail, fence, and table
<br />BOP Replace restroom partitions with Santana Product (A building) 3,500
<br />BOP Replace restroom partitions with Santana Product (BDS) 2,800
<br />CCC Replace mini -blinds in Room 2 and preschool 600
<br />OMC Replace counter top 2,000
<br />BOC Install stairs at storage area 2,500
<br />OMC Install new carpet 3,500
<br />BOC Replace kitchen counter 1,200
<br />TOTAL $ 34,300
<br />Capital Outlay:
<br />Sorter/feeder for copier $ 1,500
<br />The 2001-2002 Budget represents a 6.2 percent increase over the 2000-2001 Budget
<br />* A glossary of the three letter codes is attached as Appendix A.
<br />wcs-p-bm
<br />52.
<br />
|