Laserfiche WebLink
WORK CENTER BUDGET SUMMARY <br />DIVISION: Parks and Planning <br />WORK CENTER: Building Maintenance <br />ANALYSIS: <br />'i�X ��' "Y. a;.re}.i:,i.: <br />r4.. .,.o}.u:. <br />.-}-;�. °•rY.:.r:,y- <br />]�. ::>t}:; `:. :�.i <br />$ 2,700 <br />:.u{0.O wa4'^' ..{.:0. �- �• .i <br />'•:,-0vJS}�G jr •:-f0'". r <br />,•..•Y:U <br />� �4:r✓4 � .%4,{r <br />l 'Y;v <br />Oi?tia A:' <br />¢i' <br />::}}: <br />.it:: :9¢. 4'. ".F•. v }'a\ .:.} :.:Y <br />'-0Lti4:w.. ..:}].vY: <br />:4]:. Y: 4.'. <br />.:�. :4xG <br />Paint Room 16, main hall, and entrance <br />2,000 <br />TOC <br />Paint lounge and crafts room <br />2,500 <br />OPS <br />Whole Access Trail: paint restroom, repair and <br />4,500 <br />$456,426 <br />$467,505 <br />$496,206 <br />$457,964 <br />$516,828 <br />195,974 <br />179,554 <br />179,150 <br />168,289 <br />199,100 <br />.y <br />1,650 <br />3,969 <br />6,200 <br />6,568 <br />7,700 <br />rlr x.O:+:�o .Oi.'`•4:0 - •n vv": v,•,h, <br />$654,050 <br />$651,028 <br />$681,556 <br />$632,821 <br />$723,628 <br />ANALYSIS: <br />BOP Replace restroom partitions with Santana Product (A building) 3,500 <br />BOP Replace restroom partitions with Santana Product (BDS) 2,800 <br />CCC Replace mini -blinds in Room 2 and preschool 600 <br />OMC Replace counter top 2,000 <br />BOC Install stairs at storage area 2,500 <br />OMC Install new carpet 3,500 <br />BOC Replace kitchen counter 1,200 <br />TOTAL $ 34,300 <br />Capital Outlay: <br />Sorter/feeder for copier $ 1,500 <br />The 2001-2002 Budget represents a 6.2 percent increase over the 2000-2001 Budget <br />* A glossary of the three letter codes is attached as Appendix A. <br />wcs-p-bm <br />52. <br />Milior Repairs** <br />CRB <br />Employee time clocks Psat two) $1,350 each <br />$ 2,700 <br />CCP <br />TOC <br />Replace outside storage door <br />3,000 <br />STI <br />Paint schoolhouse <br />3,500 <br />BOC <br />Paint Room 16, main hall, and entrance <br />2,000 <br />TOC <br />Paint lounge and crafts room <br />2,500 <br />OPS <br />Whole Access Trail: paint restroom, repair and <br />4,500 <br />maintenance of trail, fence, and table <br />BOP Replace restroom partitions with Santana Product (A building) 3,500 <br />BOP Replace restroom partitions with Santana Product (BDS) 2,800 <br />CCC Replace mini -blinds in Room 2 and preschool 600 <br />OMC Replace counter top 2,000 <br />BOC Install stairs at storage area 2,500 <br />OMC Install new carpet 3,500 <br />BOC Replace kitchen counter 1,200 <br />TOTAL $ 34,300 <br />Capital Outlay: <br />Sorter/feeder for copier $ 1,500 <br />The 2001-2002 Budget represents a 6.2 percent increase over the 2000-2001 Budget <br />* A glossary of the three letter codes is attached as Appendix A. <br />wcs-p-bm <br />52. <br />