My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
VEHICLE PURCHASE
ConejoRPD
>
Public Access
>
Archive
>
Board Meetings
>
Agendas
>
2019
>
090519
>
VEHICLE PURCHASE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2019 11:24:22 AM
Creation date
8/30/2019 11:24:01 AM
Metadata
Fields
Template:
Board
Document Type
Agenda
Date
9/5/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conejo Recreation & Park District <br />GENERAL MANAGER <br />Jim Friedl <br />DATE: September 5, 2019 <br />TO: Board of Directors <br />BOARD OF DIRECTORS <br />Chuck Huffer, Chair <br />George M. Lange, Vice Chair <br />Susan L. Holt, Director <br />Nellie Cusworth, Director <br />Doug Nickles, Director <br />GENERAL MANAGER EMERITUS <br />Tex Ward <br />FROM: Jim Friedl, General Manage <br />SUBJECT: Purchase of Five Vehicl s and hicle with Aerial Lift <br />RECOMMENDATION <br />1. Award purchase in the total amount of $175,479.29 to Fairview Ford as follows: <br />• One (1) 2020 Y2 -Ton Extended Cab 4X2 Truck in the amount of $26,594.00 <br />• One (1) 2020 1/ -Ton Extended Cab 4X2 Truck in the amount of $27,096.00 <br />• One (1) 2020 3/ -Ton Extended Cab 4X4 Truck in the amount of $29,896.00 <br />• One (1) 2020 %-Ton Regular Cab 4X2 Utility Bed Truck in the amount of $32,994.00 <br />• One (1) 2020 1 -Ton Van with a 14 Foot Box Body in the amount of $46,993.00 <br />• Tire fees ($47.25) and sales tax ($11,859.04) <br />Funds are available in the Equipment Reserve Fund. <br />2. Award purchase in the total amount of $163,133.00 to Altec Capital Services as follows: <br />• One (1) 2019 Ford F-550 With Altec AT48S Aerial Lift in the amount of $163,133.00 through <br />the State of California Contract (#4-02-23-0013A). <br />Funds are available in the Equipment Reserve Fund. <br />DISCUSSION <br />Five Vehicle Purchase <br />One (1) 2020 %-Ton Extended Cab 42 Truck will replace current asset #P0213, a 2013 Ford <br />F-150 Extended Cab 4X2. Asset #P0213 has reached the end of its life cycle and requires <br />replacement. <br />One (1) 2020 3/4 -Ton Extended Cab 4x2 Truck will replace current asset #P0212, a 2013 Chevrolet <br />250OHD Extended Cab 4x2 Truck. Asset #P0212 has reached the end of its life cycle and requires <br />replacement. <br />ADMINISTRATIVE OFFICES <br />403 West Hillcrest Drive - Thousand Oaks, CA 91360-4223 <br />(805) 495-6471 - FAX: (805) 497-3199 • Email: parks@crpd.org • Website: www.crpd.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.